Sr. | Doc. Name | Doc No. | Issue date | Project System |
1. | HVAC Operation Re-Qualification Report | OQP-H-08423 | July.2023 | AHU-04,05,06&07 |
2. | Compressed Gas System Operation Qualification Report | OQP-G-02123 | July.2023 | Production Area |
3. | INSTALLED HEPA FILTER LEAK TEST REPORT (Coating ) | HLT-11223 | June , 2023 | Coating Machine |
4. | AIR VELOCITY VERIFICATION TEST REPORT | FHV-00423 | Aug.,2023 | Fume Hood |
5. | AIR VISUALIZATION TEST REPORT | AVFH-00223 | Aug.,2023 | Fume Hood |