01 AIR CHANGE RATE TEST REPORT ACH- 07825 Nov., 2025 Production Area 02 AIR CHANGE RATE TEST REPORT ACH- 07925 Nov., 2025 Production Area 03 AIR CHANGE RATE TEST REPORT ACH- 08025 Nov., 2025 Production Area…
APEX Pharma-Oven-THV-KSA
No. Doc. Name Issue date Doc. No. Area 01 Performance Qualification Protocol (QCE-017) Nov., 2025 PQP-V-01325 Methodology Lab. 02 Performance Qualification Annex (QCE-017) Nov., 2025 PQR-V-01325 Methodology Lab. 03 Performance Qualification Turn Over Package (QCE-017) Nov., 2025 TOP-PQ-01325 Methodology Lab.…
LAMAR
Sr. Doc. Name Doc. No Issue date Project system 1 BIO SAFETY CABINET RE-QUALIFICATION PROTOCOL RQP-L-30725 Nov, 2025 Micro Lab AREA…
LAMAR
Sr. Doc. Name Doc. No Issue date Project system 1 BIO SAFETY CABINET RE-QUALIFICATION PROTOCOL RQP-L-30725 Nov, 2025 Micro Lab AREA…
APEX Pharma-Refrigerator-THM-KSA
No. Doc. Name Issue date Doc. No. Area 01 Re-Qualification Protocol (QCE-037) Nov., 2025 PQP-M-01225 Raw material retained sample (QC-033) 02 Re-Qualification Annex (QCE-037) Nov., 2025 PQR-M-01225 Raw material retained sample (QC-033) 03 Re-Qualification Turn Over Package (QCE-037) Nov., 2025 TOP-PQ-01225 Raw material retained sample (QC-033)…
INAD PHARMA
Sr. Doc. Name Doc No. Issue date Project System 01 INSTALLED ABSOLUTE HEPA FILTER LEAK TEST REPORT(AHU-01) HLT-16725 Nov., 2025 Strile 02 INSTALLED ABSOLUTE HEPA FILTER LEAK TEST REPORT(AHU-03) HLT-16825 Nov., 2025 Strile 03 INSTALLED ABSOLUTE HEPA FILTER LEAK TEST REPORT(AHU-05) HLT-17025 Nov., 2025 Strile 04 INSTALLED ABSOLUTE HEPA FILTER LEAK TEST REPORT(AHU-08) HLT-17125 Nov., 2025 Strile 05 INSTALLED ABSOLUTE HEPA FILTER LEAK TEST REPORT(AHU-10) HLT-17225 Nov., 2025 Strile 06 INSTALLED ABSOLUTE HEPA FILTER LEAK TEST REPORT(AHU-11) HLT-17725 Nov., 2025…
APEX Pharma-Refrigerator-THM-KSA
No. Doc. Name Issue date Doc. No. Area 01 Re-Qualification Protocol (QCE-016) Nov., 2025 PQP-M-01125 Methodology Lab. (QC-019) 02 Re-Qualification Annex (QCE-016) Nov., 2025 PQR-M-01125 Methodology Lab. (QC-019) 03 Re-Qualification Turn Over Package (QCE-016) Nov., 2025 TOP-PQ-01125 Methodology Lab. (QC-019)…
EL NILE COMPANY FOR PHARMACEUTICALS & CHEMICAL INDUSTRIES
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC RE-QUALIFICATION REPORT RQP-H-19525 Aug., 2025 Syrap Area…
BARKOUKY
Sr. Doc. Name Doc. No Issue date Project system 1 WATER FLOW RATE MEASUREMENTS TEST REPORT WBR-01925 Nov, 2025 Office AREA 2 FCUs AIR FLOW RATE MEASUREMENT TEST REPORT AFR-02025 Nov, 2025 Office AREA…
APEX Pharma-Refrigerator-THM-KSA
No. Doc. Name Issue date Doc. No. Area 01 Re-Qualification Protocol (QCE-011) Nov., 2025 PQP-M-01025 Instrumental Lab. (QC-017) 02 Re-Qualification Annex (QCE-011) Nov., 2025 PQR-M-01025 Instrumental Lab. (QC-017) 03 Re-Qualification Turn Over Package (QCE-011) Nov., 2025 TOP-PQ-01025 Instrumental Lab. (QC-017)…