SPPF-Sterile production & Micro lab area

Sr. Doc. Name Doc. No Issue date Project System Area 01 HVAC operation Re-Qualification Report (AHU-08) RQP-H-02624 Sep.,2024 Sterile Production Area 02 HVAC operation Re-Qualification Report (AHU-09) RQP-H-02724 Sep.,2024 Sterile Production Area 03 HVAC operation Re-Qualification Report (AHU-16) RQP-H-02824 Sep.,2024 Sterile Micro Lab Area…

Nerhadou-PHASE I & PHASE II

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Installation Qualification Report IQP-H-03724 Sep., 2024 Phase I 2 HVAC Operation Qualification Report OQP-H-12324 Sep., 2024 Phase I 3 HVAC Testing, Adjusting & Balancing Report TAB-07824 Sep., 2024 Phase I 4 Turn Over Package TOP-02124 Sep., 2024 Phase I 5 HVAC Installation Qualification Report IQP-H-03324 Aug., 2024 Phase II 6 HVAC Operation Qualification Report OQP-H-11724 Aug., 2024 Phase II 7 HVAC Testing, Adjusting & Balancing Report TAB-07324 Aug., 2024…

Apex-Pharma-KSA-TMH

Sr. Doc. Name Doc. No Issue date Project System 01 Refrigerator (QCE-026) THM-01524 Jul,2024 THM Protocol + Report + TOP…

WNB-Units

Sr. Doc. Name Doc. No Issue date Project System 01 Units Operation Re-Qualification Protocol RQP-L-25624 Sep, 2024 Filling Area 02 Units Operation Re-Qualification Protocol RQP-L-25724 Sep, 2024 Micro Area 03 LAF Operation Re-Qualification Protocol RQP-L-25524 Sep, 2024 Weighing Area 04 Weighing Booth Operation Re-Qualification Reports RQP-L-25924 Sep.,2024 Dispensing Area 05 Units Operation Re-Qualification Reports RQP-L-25824 Sep.,2024 Sampling Area 06 LAF Operation Re-Qualification Reports RQP-L-26124 Sep.,2024 Syring Prep Room 07 LAF Operation Re-Qualification Reports RQP-L-26024 Sep.,2024 Washing Room…