| Sr. | Doc. Name | Doc No. | Issue date | Project System |
| Operation Re-Qualification Protocol & Annexes | RQP-H-06023 | May ,2023 | Production Area | |
| (Fluid Bed Dryer, Fluid Bed Dryer 5kg, XIAOLUN Coating & Air shower )INSTALLED HEPA FILTER LEAK TEST REPORTs | HLT-05423 To HLT-05723 | May , 2023 | Production Area | |
| Air shower Paricle count test | PCR-01823 | May , 2023 | Production Area | |
| Air shower Recovery test | RTT-09523 | May , 2023 | Production Area | |
| Air shower Air Visualisation test | AVU-01523 | May , 2023 | Production Area |