Sr. Doc. Name Doc. No Issue date Project System 01 Testing, Adjusting & Balancing Report Volume 01 of 05 TAB-03422 Nov 2019 Forth Floor 02 Testing, Adjusting & Balancing Report Volume 02 of 05 TAB-03522 Nov 2019 From 3rd to 1st Floor 03 Testing, Adjusting & Balancing Report Volume 03 of 05 TAB-03622 Nov 2019 Ground Floor 04 Testing, Adjusting & Balancing Report Volume 04 of 05 TAB-03722 Nov 2019 Basement 1 05 Testing, Adjusting & Balancing Report Volume 05…
SEDICO Sterile LAFs
S.N Doc. Name Doc No. Issue date Project System 1 LAF HVAC Re-Qualification Protocol &Annexes RQP-L-04222 Apr.2022 SEDICO Sterile Area LAFs…
ATECO EDITS-2
S.N Doc. Name Doc No. Issue date Project System 1 HVAC (Air Side)Design Edits ACH Adjusting test Reports from ( ACH- 04322 to ACH- 04522) Apr.2022 (LVP1 AUTOCLAVE PIT, Disinfectant ( PREP.+ FILLING), Washing bay) Rooms 2 HVAC (Air Side)Design Edits Pressure Adjusting test Reports from ( PDT- 00422 to PDT- 00522) Apr.2022 LVP1 AUTOCLAVE PIT, Disinfectant ( PREP.+ FILLING), Washing bay) Rooms 3 HVAC (Air Side)Design HEPA Filters Leak test Reports from ( HLT- 05222 to HLT- 05422) Apr.2022…
HI PHARM
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation RE-Qualification Protocol OQP-H-02722 Mar.,2022 Solid area…
LIPTIS
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation RE-Qualification Protocol RQP-H-03422 Mar.,2022 PRODUCTION AREA…
Marcyrl
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Protocol From RQP-H-02922 To RQP-H-03422 Feb.,2022 Sterile Area…
SEDICO Oncology-ECS
S.N Doc. Name Doc No. Issue date Project System 1 HVAC Installation Qualification Protocol & Annex IQP-H-00922 Mar.2022 SEDICO Oncology (ECS) 2 HVAC Operation Qualification Protocol & Annex OQP-H-03522 Mar.2022 SEDICO Oncology (ECS) 3 HVAC Testing Adjusting & Balancing Protocol & Annex TAB-03322 Mar.2022 SEDICO Oncology (ECS) 4 HVAC Turn over package TOP-00522 Mar.2022 SEDICO Oncology (ECS)…
Al Andalous-machines
Sr. Doc. Name Doc No. Issue date Project System 01 HEPA FILTERS LEAK TEST. HLT-04622 To HLT-04722 Mar.2022 Sejouy coater & Fluid bed dryer…
GYPTO PHARMA (WBs -DP4)
S.N Doc. Name Doc No. Issue date Project System 1 Weighing Booth Operation Qualification Protocol & Annex RQP-L-04122 Mar.2022 (ZONE-DP04)…
Scop Medical-TAB, OQ & TOP
Sr. Doc. Name Doc. No Issue date Project System 01 HVAC Testing Adjusting & Balancing Report (Protocol & Annexes) TAB-00422 March, 2022 TAB 02 HVAC Operation Qualification Report (Protocol & Annexes) OQP-H-00322 March, 2022 OQ 03 Turn Over Package TOP-00222 March, 2022 TOP…