S.N | Doc. Name | Doc No. | Issue date | Project System |
1 | HVAC (Air Side)Design Edits ACH Adjusting test Reports | from ( ACH- 04322 to ACH- 04522) | Apr.2022 | (LVP1 AUTOCLAVE PIT, Disinfectant ( PREP.+ FILLING), Washing bay) Rooms |
2 | HVAC (Air Side)Design Edits Pressure Adjusting test Reports | from ( PDT- 00422 to PDT- 00522) | Apr.2022 | LVP1 AUTOCLAVE PIT, Disinfectant ( PREP.+ FILLING), Washing bay) Rooms |
3 | HVAC (Air Side)Design HEPA Filters Leak test Reports | from ( HLT- 05222 to HLT- 05422) | Apr.2022 | LVP1 AUTOCLAVE PIT, Disinfectant ( PREP.+ FILLING), Washing bay) Rooms |
4 | HVAC (Air Side)Design Edits P.C test Reports | from ( PCR- 01922 to PCR- 02122) | Apr.2022 | LVP1 AUTOCLAVE PIT, Disinfectant ( PREP.+ FILLING), Washing bay) Rooms |
5 | HVAC (Air Side)Design Edits Recovery test Reports | from ( RTT- 01822 to RTT- 02022) | Apr.2022 | LVP1 AUTOCLAVE PIT, Disinfectant ( PREP.+ FILLING), Washing bay) Rooms |
6 | HVAC (Air Side)Design Edits Air Pattern test Reports | from ( AVN- 03422 to AVN- 03622) | Apr.2022 | LVP1 AUTOCLAVE PIT, Disinfectant ( PREP.+ FILLING), Washing bay) Rooms |