Category: Uncategorized

Biogeneric-BGP-Testing&Balancing

Sr. Doc. Name Doc No. Issue date Project System 1 Testing, Adjusting & Balancing Protocol& Annex (Air Side) TAB-08022 July.2023 (Air Side) 2 Testing, Adjusting & Balancing Protocol& Annex (Chilled&Hot Water Side) TAB-08022 July.2024 (Chilled&Hot Water Side)…

Amana- NUPCO Pharmaceutical-KSA-TAB

Sr. Doc. Name Issue date Doc. No. Project System 01 Testing, Adjusting & Balancing Report (Protocol & Annex) (RTU-G06-D) Aug., 2023 TAB-02123 Ambient Storage 02 Testing, Adjusting & Balancing Report (Protocol & Annex) (RTU-G06-F) Aug., 2023 TAB-02223 Ambient Storage 03 Testing, Adjusting & Balancing Report (Protocol & Annex) (RTU-G06-E) Aug., 2023 TAB-02323 Ambient Storage 04 Testing, Adjusting & Balancing Report (Protocol & Annex) (RTU-G06-A) Aug., 2023 TAB-02423 Ambient Storage 05 Testing, Adjusting & Balancing Report (Protocol & Annex) (RTU-G03) Aug.,…

(EMCO) Works in (Crown British School)

Sr. Doc. Name Doc No. Issue date Project System 1 Testing, Adjusting & Balancing Protocol& Annex (Ground Floor) RQP-H-07923 TAB-06923 Ground Floor) 2 Testing, Adjusting & Balancing Protocol& Annex (First Floor) RQP-H-07923 TAB-07023 First Floor 3 Testing, Adjusting & Balancing Protocol& Annex (Second Floor) RQP-H-07923 TAB-07123 Second Floor…

(RIVA PHARMA ) Works in (Production Area)

Sr. Doc. Name Doc No. Issue date Project System 1.   HVAC Operation Re-Qualification Report OQP-H-08423 July.2023 AHU-04,05,06&07 2.   Compressed Gas System Operation Qualification Report OQP-G-02123 July.2023 Production Area 3.   INSTALLED HEPA FILTER LEAK TEST REPORT (Coating ) HLT-11223 June , 2023 Coating Machine 4.   AIR VELOCITY VERIFICATION TEST REPORT FHV-00423 Aug.,2023 Fume Hood 5.   AIR VISUALIZATION TEST REPORT AVFH-00223 Aug.,2023 Fume Hood…