Doc. Name | Doc. No. | Issue Date | Area |
Pass Box Operation Qualification Protocol & Annexes (AV. Pass Box / PAS-F-AV-E-02-003) | OQP-L-28724 | Nov., 2024 | AV. Raw Material Warehouse Area |
Pass Box Operation Re-Qualification Protocol & Annexes (Pass Box / ROOM (F-OS-E-12) | RQP-L-28824 | Nov., 2024 | Between Solid and R&D Area |
Pass Box Operation Re-Qualification Protocol & Annexes (Pass Box / PAS-G-WH-D-11-092) | RQP-L-28924 | Nov., 2024 | Dispensing Area |
LAF Operation Re-Qualification Protocol & Annexes (Dispensing LAF / DIC-F-WH-D-10-021) | RQP-L-29024 | Nov., 2024 | Dispensing Area (Dispensing Room) |
Pass Box Operation Re-Qualification Protocol & Annexes (Pass Box / PAS-G-OL-D-22-042) | RQP-L-29124 | Nov., 2024 | Filling Area |
Installed HEPA Filter Leak Test Report (Exhaust Fan/EX.F-17) | HLT-14024 | Nov., 2024 | AV. Preparation Area |
Installed HEPA Filter Leak Test Report (Exhaust Fan/EX.F-17’) | HLT-14124 | Nov., 2024 | AV. Compression Area |