Note that it’s for (MEVAC) works in (B-02 First Floor)
| Sr. | Doc. Name | Doc No. | Issue date | Project System |
| 01 | LAFs OPERATION QUALIFICATION report | OQP-L- 10325 | Apr., 2025 | LIVE VIRUS PRODUCTION AREA |
| 02 | PASS BOXs OPERATION QUALIFICATION report | OQP-L- 10825 | Apr., 2025 | FIRST FLOOR |
| 03 | Safety Cabinets Operation Qualification Protocol | OQP-L- 10725 | Apr., 2025 | LIVE VIRUS PRODUCTION AREA |