| Sr. | Doc. Name | Doc No. | Issue date | Project System |
| 1 | HVAC Operation Re-Qualification Protocol For (AHU-07, AHU-08, AHU-09, AHU-10& AHU-11) | RQP-H-12524 | Sept., 2024 | Non-Sterile Area |
| 2 | AIR VELOCITY VERIFICATION TEST REPORT | FHV-00124 | Sept., 2024 | Micro Area |
| 3 | AIR VISUALIZATION TEST REPORT (NUDAF) | FHP-00124 | Sept., 2024 | Micro Area |
| 4 | Micro Isolator Operation Re-Qualification Protocol | RQP-H-12624 | Sept., 2024 | Micro Area |
| 5 | LAF Operation Re-Qualification Protocol | RQP-H-12724 | Sept., 2024 | Dispensing Area |
| 6 | Isolator Operation Re-Qualification Protocol | RQP-H-12824 | Sept., 2024 | Dispensing Area |
| 7 | LAFs Operation Re-Qualification Protocol | RQP-H-12924 | Sept., 2024 | Sterile Area |
| 8 | Pass Boxes Operation Re-Qualification Protocol | RQP-H-13024 | Sept., 2024 | Sterile Area |
| 9 | Safety Cabinets Operation Re Qualification Protocol | RQP-H-13124 | Sept., 2024 | Micro lab |
| 10 | HVAC Operation Re-Qualification Protocol | RQP-H-13224 | Sept., 2024 | Sterile Area |
| 11 | Tunnel Operation Re-Qualification Protocol | RQP-H-13324 | Sept., 2024 | Sterile Area |