| S.N | Doc. Name | Doc No. | Issue date | Project System |
| 1 | HVAC Design Qualification Protocol & Annex | DQP-H-00622 | Mar.2022 | GYPTO PHARMA (ZONE-Corridor) |
| 2 | HVAC Installation Qualification Protocol & Annex | IQP-H-01022 | Mar.2022 | GYPTO PHARMA (ZONE-Corridor) |
| 3 | HVAC Operation Qualification Protocol & Annex | OQP-H-04122 | Mar.2022 | GYPTO PHARMA (ZONE-Corridor) |
| 4 | HVAC Testing Adjusting & Balancing Protocol & Annex | TAB-04222 | Mar.2022 | GYPTO PHARMA (ZONE-Corridor) |
| 5 | HVAC Turn over package | TOP-00622 | Mar.2022 | GYPTO PHARMA (ZONE-Corridor) |