(ART Pharma) works in (Production, micro and sampling area)

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Qualification Protocol OQP-H-14323 31/12/2023 Production area 02 HVAC Operation Qualification Protocol OQP-H-14523 31/12/2023 Micro&sampling area 03 Compressed Gas System Operation Qualification Protocol OQP- G -03923 31/12/2023 Compressed gas 04 LAFS Operation Qualification Protocol OQP-L-25223 31/12/2023 Micro area 05 Pass Box Operation Qualification Protocol OQP-L-25123 31/12/2023 Micro area 06 Safety Cabinet Operation Qualification OQP-L-24823 31/12/2023 Micro area 07 LAFS Operation Qualification Protocol OQP-L-24623 31/12/2023 Production area 08 Pass Box…

(Biogeneric Pharma) Works in LAFs , Bass Pox and Rooms in (Production&Micro Areas)

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC  Operation Qualification  Protocol & Annexes LAFs OQP-H-24423 Dec.,2023 Production Area 2 HVAC  Operation Qualification  Protocol & Annexes Pass Box OQP-H-24523 Dec.,2023 Production Area 3 AIR VISUALIZATION TEST REPORT FOR ROOM AVN-07823 Dec.,2023 Production Area 4 AIR VISUALIZATION TEST REPORT FOR ROOM AVN-07923 Dec.,2023 Production Area 5 AIR VISUALIZATION TEST REPORT FOR ROOM AVN-08023 Dec.,2023 Production Area 6 AIR VISUALIZATION TEST REPORT FOR ROOM AVN-08123 Dec.,2023 Production Area 7 AIR…

(TEST REPORTS) Works in (EL KAHIRA PHARM)

Sr. Doc. Name Doc No. (From) Doc No. (TO) Issue date Project System 01 AIR CHANGE ADJUSTMENT TEST REPORT ACH-06323 ACH-06623 Dec,2023 Liquid Sterile 02 ROOM PRESSURE DIFFERENCE TEST REPORT PDT-02023 PDT-02323 Dec,2023 Liquid Sterile 03 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-01723 TRH-01923 Dec,2023 Liquid Sterile 04 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-17723 HLT-17923 Dec,2023 Liquid Sterile 05 AIR VISUALIZATION TEST REPORT (NUDAF) AVN-08323 AVN-08523 Dec,2023 Liquid Sterile 06 AIR BORNE PARTICLE COUNT TEST REPORT PCR-04723 PCR-04923…

SHAR (KSA)-Enclosure Integrity Test Report

Sr. Doc. Name Issue date Project System 01 Enclosure Integrity Test for Electrical Room Building-01 Dec., 2023 Neom Port Temporary Facilities 02 Enclosure Integrity Test for Electrical Room Building-02 Dec., 2023 Neom Port Temporary Facilities 03 Enclosure Integrity Test for Telecom Room – Building 01 Dec., 2023 Neom Port Temporary Facilities 04 Enclosure Integrity Test for Telecom Room – Building 02 Dec., 2023 Neom Port Temporary Facilities 05 Enclosure Integrity Test for It Room – Building 01 Dec., 2023 Neom…

(Sanofi)

Sr. Doc. Name Doc No. Issue date Project System   HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement)   TAB-11223 Dec.,2023 AHU-09   HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11323 Dec.,2023 AHU-12   HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11423 Dec.,2023 AHU-14   HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11523 Dec.,2023 AHU-ZMSA   HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11623 Dec.,2023 AHU-ZMDI   HVAC Testing, Adjusting &…