Sr. Doc. Name Doc.No Issue date Project system 1 Compressed Gas System Operation Re-Qualification Repot RQP-G-02624 May,2024 Compressed Gas System …
(UTOPIA PHARMACEUTICAL PHARMACEUTICAL) _ (Syrup & Production Area)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Report RQP-H-05424 May,2024 Syrup Area 02 HVAC Operation Re-Qualification Report RQP-H-06424 May,2024 Production Area…
(GSK) _ (Lactam) Area
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Design Qualification Reports for AHUs DQP-H-00324 May, 2024 Lactam Area 2 HVAC Installation Qualification Reports for AHUs IQP-H-01524 May, 2024 Lactam Area 3 HVAC Operation Qualification Reports for AHUs OQP-H-05924 May, 2024 Lactam Area…
(Servier) _ (Micro Area)
Sr. Doc. Name Doc.No Issue date Project system 1 HVAC Operation Re-Qualification Report RQP-H-05824 May,2024 AHU-01…
(SEDICO-VISION)_ (Dispensing Area)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing ,Adjusting & balancing Report TAB-03924 May,2024 Dispensing Area…
(EGYPHAR) _ (Micro) Area
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Report for AHUs RQP-H-05024 May, 2024 Micro Area 2 HVAC Operation Re-Qualification Report for PassBoxes RQP-L-08624 May, 2024 Micro Area 3 HVAC Operation Re-Qualification Report for LAFs RQP-L-08524 May, 2024 Micro Area…
(AUG Pharma) _ (Semi-solid & Liquid area & solid area)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re Qualification Protocol RQP-H-05624 05/2024 AHU-09 & AHU-10 02 HVAC Operation Re Qualification Protocol RQP-H-05724 05/2024 AHU-02 AHU-03 AHU-04 AHU-05 AHU-06 AHU-07 AHU-08 AHU-11 AHU-14 AHU-5/1 AHU-6/1 AHU-14/1 …
(October Pharma)_ (Micro Area)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re Qualification Protocol RQP-H-05524 05/2024 AHU-L01 & AHU-L02 02 LAF Operation Re Qualification Protocol RQP-L-09024 05/2024 Horizontal LAF/100181 &Vertical LAF/100181 03 Pass Box Operation Re Qualification Protocol RQP-L-09124 05/2024 (Pass Box/100194 & Pass Box/100195 & Pass Box/100193 & Pass Box/100191 & Pass Box/100192 & Pass Box/100190) 04 AIR VELOCITY VERIFICATION TEST REPORT FVT-01224 05/2024 Fume Hood/100180/Room 332 05 AIR VISUALIZATION TEST REPORT (NUDAF) AVU-01324 05/2024 Fume Hood/100180/Room 332…
LIPTIS Pharmaceuticals _ (Production Area)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Report RQP-H-05424 May.,2024 Production Area…
(ADCO PHARMA) _ (Warehouse Area)
Sr. Doc. Name Doc. No. Issue date Project System 1 HVAC Installation Qualification Report IQP-H-01024 May,2024 AHU-01 2 HVAC Testing, Adjusting & Balancing Report TAB-03224 May,2024 AHU-01 3 HVAC Operation Qualification Report OQP-H-04924 May,2024 AHU-01 4 TURN OVER PACKAGE TOP-00924 May,2024 AHU-01…