Sr. Doc. Name Doc.No Issue date Project system 1 Compressed Gas System Operation Re-Qualification Repot RQP-G-03424 June,2024 Compressed Gas System …
(UTOPIA PHARMACEUTICAL ) _ (Syrup & Production Area)
Sr. Doc. Name Doc No. Issue date Project System 01 Compressed Gas System Qualification Report RQP- G -03324 Jun,2024 Production Area 02 LAFs Operation Re-Qualification Report RQP-L-14724 Jun,2024 Production Area 03 Compressed Gas System Re-Qualification Report RQP- G -02724 May,2024 Syrup Area 04 Pass Box Operation Re-Qualification Report RQP-L-09624 May,2024 Production Area 05 Pass Boxes Operation Re-Qualification Report RQP-L-14824 May,2024 Production Area 06 LAF Operation Re-Qualification Report RQP-L-14924 Jun,2024 Production Area…
JamJoom-Sterile Area
Sr. Doc. Name Doc No. Issue date Project System 1 Turn Over Package for Sterile Area TOP-01524 June, 2024 Sterile Area…
GSK-HARAM-LACTAM AREA
Sr. Doc. Name Doc No. Issue date Project System 1 Recovery Time Test for LAFs in Lactam Area RRT-02624 June, 2024 Lactam Area 2 Recovery Time Test for Pass Boxes in Lactam Area RTT-02724 June, 2024 Lactam Area 3 Recovery Time Test for Zones in Lactam Area RTT-02824 June, 2024 Lactam Area…
ZETA
Doc. Name Doc. No. Issue Date Area Pass Boxes Operation Re-Qualification RQP-L-13924 MAy,2024 ZETA PHARMA Dispensing Booth Operation Re-Qualification RQP-L-14024 MAy,2024 ZETA PHARMA Sampling Booth Operation Re-Qualification RQP-L-14124 MAy,2024 ZETA PHARMA Safety Cabinets Operation Re-Qualification RQP-L-14224 MAy,2024 ZETA PHARMA …
GSK-Lactam Area
Sr. Doc. Name Doc No. Issue date Project System 1 Recovery Rate Test for Lactam Area RRT-02424 June, 2024 Lactam Area 2 Recovery Time Test for Lactam Area RTT-02524 June, 2024 Lactam Area…
(BEL)_ (Cairo A & Cairo B)
Sr. Doc. Name Doc. No. Issue date Project System 1 Technical assessment Report June,2024 CA – CB 2 HVAC Installation Qualification Report IQP-H-02224 – IQP-H-02324 June,2024 CA – CB 3 HVAC As Found Measurements Report TAB-05024 – TAB-05224 June,2024 CA – CB 4 Design Package TOP-01324 – TOP-01424 June,2024 CA – CB…
(BIOGENERIC)_ (Compi Area)
Sr. Doc. Name Doc.No Issue date Project system 1 RECOVERY RATE TEST REPORT RRT-02324 25/06/2424 Compi Area 2 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-06524 25/06/2424 Compi Area 3 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-01224 25/06/2424 Compi Area…
(BIOGENERIC)_ (VACCINE AREA)
Sr. Doc. Name Doc.No Issue date Project system 1 HVAC Testing, Adjusting & Balancing Report TAB-05124 18/05/2024 VACCINE AREA…
(مصلحة ضرائب كبار الممولين)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report TAB- 00424 Jan., 2024 مصلحة ضرائب كبار الممولين…