Category: Uncategorized

Hikma-October city

S.N Doc. Name Doc No. Issue date Project System 1         HVAC Air Visualization Test Reports AVN-(04922-08122) Sep.2022 (solid section-semi-solid,liquid sections-pilot plant area)…

UTOPIA- Water Balance

Sr. Doc. Name Doc No. Issue date Project System 1   WATER FLOW RATE MEASUREMENTS REPORT WBR-00222 Sep.,2022 Administrative Building…

Hunger Station

Sr. Doc. Name Doc. No Issue date Project System 01 FAN PERFORMANCE MEASUREMENTS Test REPORT APT-01922 Sep, 2022 EX.F./ Fresh Fan 02 AIR FLOW RATE MEASUREMENTS TEST REPORT AFR-00122 Sep, 2022 EX.F./ Fresh Fan…

Sedico -Dispensing RQ

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Protocol for(AHU-101)   RQP-H-07222/01 Aug,2022 Dispensing area…

EGYPHAR(MI-C-09 & MI-C-11)

Sr. Doc. Name Doc No. Issue date Project System   1 LAFS Operation Re-Qualification Protocol RQP-L-07322 Aug.,2022 MI-C-09 2   LAFS Operation Re-Qualification Protocol   RQP-L-07422 Aug.,2022 MI-C-11…

RIYADH PHARMA-Test Report

Sr. Doc. Name Issue date Doc. No. Project System 01 HEPA Filter Leak Test Report (Terminal)   Aug., 2022 From (HLT-02222) to (HLT-02522) Micro Area 02 Absolute HEPA Filter Leak Test Report   Aug., 2022 From (HLT-01022) to (HLT-01122) Sterile Area & Micro Area 03 HEPA Filter Leak Test Report (Terminal)   Aug., 2022 From) HLT-01222) to (HLT-02122) and from) HLT-02922) to (HLT-03122) Sterile Area 04 HEPA Filter Leak Test Report (LAF)   Aug., 2022 From) HLT-00422) to (HLT-00922) and…

EGYPHAR 1 RQ

Sr. Doc. Name Doc No. Issue date Project System   1 HVAC Operation Re-Qualification Report RQP-H-06422 Aug.,2022 Solid 1 2   HVAC Operation Re-Qualification Report RQP-H-06522 Aug.,2022 Dispensing 3   HVAC Operation Re-Qualification Report RQP-H-06622 Aug.,2022 Sampling 4   HVAC Operation Re-Qualification Report RQP-H-06722 Aug.,2022 Liquid 5   HVAC Operation Re-Qualification Report RQP-H-06822 Aug.,2022 Solid 2…

Ministry of Housing, Utilities & Urban Communities(C12 Tower)

Sr. Doc. Name Doc. No Issue date Project System 01 Testing, Adjusting & Balancing Report Volume 01 of 05 TAB-08622 Aug, 2022 AHUs 02 Testing, Adjusting & Balancing Report Volume 02 of 05 TAB-08722 Aug, 2022 CAHUs 03 Testing, Adjusting & Balancing Report Volume 03 of 05 TAB-08822 Aug, 2022 FCUs 04 Testing, Adjusting & Balancing Report Volume 04 of 05 TAB-08922 Aug, 2022 FANs 05 Testing, Adjusting & Balancing Report Volume 05 of 05 TAB-09022 Aug, 2022 Chilled water…