Category: Uncategorized

AL-NASR PHARMACEUTICAL CHEMICALS   

Sr. Doc. Name Doc.No Issue date Project system 1 HVAC INSTALLATION QUALIFICATION REPORT IQP-H-02825 Sep.,2025 مصنع الخامات 2 TESTING, ADJUSTING & BALANCING REPORT TAB-07425 Sep.,2025 مصنع الخامات 3 HVAC OPERATION & PERFORMANCE QUALIFICATION REPORT O&PQP-H-21625 Sep.,2025 مصنع الخامات 4 HVAC OPERATION & PERFORMANCE QUALIFICATION REPORT O&PQP-H-21925 Sep.,2025 المعمل 5 HVAC OPERATION & PERFORMANCE QUALIFICATION REPORT O&PQP-H-22025 Sep.,2025 Sampling…

Klybeck – Re-Qualification – KSA

Sr. Doc. Name Issue date Doc. No. Area 01  HVAC Re- Qualification Protocol & Annexes (AHU-24) Sept., 2025 RQP-H-08125 Sampling Area 02 HVAC Re-Qualification TOP Sept.,2025 TOP-H-00525 Sampling Area…

AMAD Hospital-Refrigerator-ThM-KSA

Sr. Doc. Name Issue date Doc. No. Area 01 Performance Qualification Protocol (REFPA01) Aug., 2025 PQP-M-00125 Ivannte Room 02 Performance Qualification Annex (REFPA01) Aug., 2025 PQR-M-00125 Ivannte Room 03 Performance Qualification Turn Over Package (REFPA01) Aug., 2025 TOP-PQ-00125 Ivannte Room…

CSI

Note that it’s for (CSI ) works in (DOME area) Sr. Doc. Name Doc No. Issue date Project System 01 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-14225 Sep, 2025 Dome 1 area 02 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-14125 Sep, 2025 Dome 2 area 03 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-14025 Sep, 2025 Dome 3 area…

ARABCOMED

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC PERFORMANCE RE-QUALIFICATION REPORT RQP-H-21725 Sep., 2025 Dispensing Area 02 HVAC PERFORMANCE RE-QUALIFICATION REPORT RQP-H-21825 Sep., 2025 Micro Lab Area 03 BOOTH RE-QUALIFICATION REPORT RQP-L-26525 Sep., 2025 Dispensing Area 04 LAF RE-QUALIFICATION REPORT RQP-L-26625 Sep., 2025 Micro Lab Area 05 SAFETY CABINET RE-QUALIFICATION REPORT RQP-L-26725 Sep., 2025 Micro Lab Area 06 PASS BOXES RE-QUALIFICATION REPORT RQP-L-26825 Sep., 2025 Micro Lab Area…

SPPF-HPHV STEAM STERILIZER-ThV-KSA

Sr. Doc. Name Issue date Doc. No. Area 01 Re-Qualification Protocol (APD-036) Aug., 2025 PQP-V-00225 Loading area (PSL-17) 02 Re-Qualification Annex (APD-036) Aug., 2025 PQR-V-00225 Loading area (PSL-17) 03 Re-Qualification Turn Over Package (APD-036) Aug., 2025 TOP-PQ-00225 Loading area (PSL-17)…

Apex Pharma

Sr. Doc. Name Doc No. Issue date Project System 01 RECOVERY RATE TEST REPORT RRT-14125 Sep., 2025 Production Area 02 RECOVERY RATE TEST REPORT RRT-14225 Sep., 2025 Production Area 03 RECOVERY RATE TEST REPORT RRT-14325 Sep., 2025 Production Area 04 RECOVERY RATE TEST REPORT RRT-14425 Sep., 2025 Production Area 05 RECOVERY RATE TEST REPORT RRT-14525 Sep., 2025 Production Area 06 RECOVERY RATE TEST REPORT RRT-14625 Sep., 2025 Production Area 07 RECOVERY RATE TEST REPORT RRT-14725 Sep., 2025 Production Area 08…