Category: Uncategorized

CSI

Note that it’s for (CSI ) works in (DOME area) Sr. Doc. Name Doc No. Issue date Project System 01 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-14225 Sep, 2025 Dome 1 area 02 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-14125 Sep, 2025 Dome 2 area 03 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-14025 Sep, 2025 Dome 3 area…

ARABCOMED

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC PERFORMANCE RE-QUALIFICATION REPORT RQP-H-21725 Sep., 2025 Dispensing Area 02 HVAC PERFORMANCE RE-QUALIFICATION REPORT RQP-H-21825 Sep., 2025 Micro Lab Area 03 BOOTH RE-QUALIFICATION REPORT RQP-L-26525 Sep., 2025 Dispensing Area 04 LAF RE-QUALIFICATION REPORT RQP-L-26625 Sep., 2025 Micro Lab Area 05 SAFETY CABINET RE-QUALIFICATION REPORT RQP-L-26725 Sep., 2025 Micro Lab Area 06 PASS BOXES RE-QUALIFICATION REPORT RQP-L-26825 Sep., 2025 Micro Lab Area…

SPPF-HPHV STEAM STERILIZER-ThV-KSA

Sr. Doc. Name Issue date Doc. No. Area 01 Re-Qualification Protocol (APD-036) Aug., 2025 PQP-V-00225 Loading area (PSL-17) 02 Re-Qualification Annex (APD-036) Aug., 2025 PQR-V-00225 Loading area (PSL-17) 03 Re-Qualification Turn Over Package (APD-036) Aug., 2025 TOP-PQ-00225 Loading area (PSL-17)…

Apex Pharma

Sr. Doc. Name Doc No. Issue date Project System 01 RECOVERY RATE TEST REPORT RRT-14125 Sep., 2025 Production Area 02 RECOVERY RATE TEST REPORT RRT-14225 Sep., 2025 Production Area 03 RECOVERY RATE TEST REPORT RRT-14325 Sep., 2025 Production Area 04 RECOVERY RATE TEST REPORT RRT-14425 Sep., 2025 Production Area 05 RECOVERY RATE TEST REPORT RRT-14525 Sep., 2025 Production Area 06 RECOVERY RATE TEST REPORT RRT-14625 Sep., 2025 Production Area 07 RECOVERY RATE TEST REPORT RRT-14725 Sep., 2025 Production Area 08…

El Razy Pharma

Note that it’s for (El Razy Pharma ) works in (production area) Sr. Doc. Name Doc No. Issue date Project System 01 AIR CHANGE RATE VERIFICATION TEST REPORT ACH-04325 Sep, 2025 Production area 02 ROOM PRESSURE DIFFERENCE VERIFICATION TEST REPORT PDT- 02325 Sep, 2025 Production area 03 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-04225 Sep, 2025 Production area 04 AIR VISUALIZATION TEST REPORT (NUDAF) AVN-02625 Sep, 2025 Production area 05 AIR BORNE PARTICLE COUNT TEST REPORT PCR-07225 Sep, 2025…

MISR PHARMACETICULES

Sr. Doc. Name Doc. No Issue date Project system 1 AIR CHANGE RATE TEST REPORT( LIQUID & SEMI SOLID AREA ) ACH-04725 Sep, 2025 LIQUID & SEMI SOLID AREA 2 ROOM PRESSURE DIFFERENCE TEST REPORT( LIQUID & SEMI SOLID AREA ) PDT-02625 Sep, 2025 LIQUID & SEMI SOLID AREA…