Sr. Doc. Name Doc No. Issue date Project System 01 PASS BOX RE-QUALIFICATION REPORT RQP-L-29025 Oct., 2025 LVP & SVP DEPARTMENT…
NERHADOU (LAB AREA)
Note that it’s for (NERHADOU ) works in (LAB Area) Sr. Doc. Name Doc No. Issue date Project System 01 AIR CHANGE RATE VERIFICATION TEST REPORT ACH-0765 Oct, 2025 Lab Area 02 ROOM PRESSURE DIFFERENCE VERIFICATION TEST REPORT PDT-04125 Oct, 2025 Lab Area…
Arab Engineers Factory Re-Qualification
01 HVAC RE-QUALIFICATION PROTOCOL RQP-H-23025 Oct., 2025 Microbiology Area…
P & G
01 AIR CHANGE RATE TEST REPORT ACH- 06725 Oct., 2025 HDW Area 02 ROOM PRESSURE DIFFERENCE TEST REPORT PDT-03325 Oct., 2025 HDW Area 03 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH- 05625 Oct., 2025 HDW Area 04 AIR BORNE PARTICLE COUNT TEST REPORT PCR- 10025 Oct., 2025 HDW Area 05 AIR CHANGE RATE TEST REPORT ACH-05725 Oct., 2025 Fem Care Area 06 ROOM PRESSURE DIFFERENCE TEST REPORT PDT-03225 Oct., 2025 Fem Care Area 07 ROOM TEMPERATURE AND RELATIVE HUMIDITY…
Ibn Sina Warehouse 6 October (Area A) Temp.
…
Ibn Sina Warehouse 6 October (Area A) RH%
…
October Pharma
Sr. Doc. Name Doc. No Issue date Project system 1 HVAC RE-QUALIFICATION REPORT RQP-H-22925 Aug, 2025 Semi Solid Area…
ميناء الدخيلة
Sr. Doc. Name Doc. No Issue date Project system 1 AHU PERFORMANCE MEASUREMENTS REPORT FAHU-01 APT-02723 Aug, 2023 AREA…
ميناء الدخيلة
Sr. Doc. Name Doc. No Issue date Project system 1 Testing, Adjusting & Balancing Protocol TAB- 08623 Aug, 2023 AREA…
Otsuka Egypt Compressed
Note that it’s for (Otsuka Egypt ) works in (Production Area) Sr. Doc. Name Doc No. Issue date Project System 01 COMPRESSED AIR SYSTEM REQUALIFICATION PROTOCOL RQP-G-08825 Oct, 2025 Production Area 02 COMPRESSED Gas SYSTEM REQUALIFICATION PROTOCOL RQP-G-08925 Oct, 2025 Production Area…