Category: Uncategorized

AL-NASR

Sr. Doc. Name Doc. No Issue date Project system 1 AIR CHANGE RATE TEST REPORT ACH-02625: ACH-02725 July, 2025 المحاليل 2 ROOM PRESSURE DIFFERENCE TEST REPORT PDT-01525: PDT-01625 July, 2025 المحاليل 3 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-03425: TRH-03525 July, 2025 المحاليل 4 AIR FLOW VISUALIZATION TEST FOR NON UDAF TEST REPORT AVN-01425: AVN-01525 July, 2025 المحاليل 5 AIR BORNE PARTICLE COUNT TEST REPORT PCR-06425: PCR-06525 July, 2025 المحاليل 6 RECOVERY RATE TEST REPORT RTT-12525: RTT-12625 July, 2025…

CID

Sr. Doc. Name Doc No. Issue date Project System 01 TUNNEL OPERATION & PERFORMANCE QUALIFICATION REPORT OQP-L-20225 July, 2025 Production Area…

Klybeck-T-FREEZER (VWH/E/051)

Sr. Doc. Name Doc. No. Issue Date Item Name 01 INSPECTION CERTIFICATE PQ-243–2025 Jul.,2025 FREEZER (VWH/E/051) 02 PERFORMANCE QUALIFICATION PROTOCOL PQP-T-12725 Jun.,2025 03 PERFORMANCE QUALIFICATION REPORT PQR-T-12825 Jul., 2025…

Klybeck-TRH-Egg Hatcher Incubator (VQC/E/104)

Sr. Doc. Name Doc. No. Issue Date Item Name 01 INSPECTION CERTIFICATE PQ-239-2025 Jul.,2025 Egg Hatcher Incubator (VQC/E/104) 02 PERFORMANCE QUALIFICATION PROTOCOL PQP-TRH-06725 Jun.,2025 03 PERFORMANCE QUALIFICATION REPORT PQR-TRH-06825 Jul., 2025…

KLYBECK HVAC Re-Qualification PHARMA Planet

Sr. Doc. Name Issue date Doc. No. Area  01 Injection Re-Qualification Protocol & Annex (AHU-01) June., 2025 RQP-H-05625 Injection Area  02 Injection ALU CAP Re-Qualification Protocol & Annex (AHU-02) June., 2025 RQP-H-00525 Injection ALU CAP  03 Injection (Ground Floor) Re-Qualification Protocol & Annex (AHU-03) June., 2025 RQP-H-00625 Injection (Ground Floor)  04 Injection (Ground Floor) & Injection MFG (1st Floor Tank) Re-Qualification Protocol & Annex (AHU-04) June., 2025 RQP-H-00725 Injection (Ground Floor) & Injection MFG (1st Floor Tank)  05 Liquid MFG…

Klybeck-HT-SIP TANK (PPR/E/043)

Sr. Doc. Name Doc. No. Issue Date Item Name 01 INSPECTION CERTIFICATE PQ-238-2025 Jun.,2025 SIP Tank (PPR/E/043) 02 PERFORMANCE QUALIFICATION PROTOCOL PQP-HT-04725 Jun.,2025 03 PERFORMANCE QUALIFICATION REPORT PQR-HT-04725 Jun., 2025…

Otsuka AL Obour

Sr. Doc. Name Doc No. Issue date Project System 01 Pass Box Re-Qualification Report (Sterility Pass Box /B1-L3-19-02) RQP-L-19325 July, 2025 Micro Area…

JAMJOOM Dispensing Area

Note that it’s for JAMJOOM PHARMA ) works in Dispensing Area Sr. Doc. Name Doc No. Issue date Project System 01 HVAC RE-QUALIFICATION PROTOCOL RQP-H-15725 Jul.,2025 Re Qualification…

KAHIRA PHARMACUTICAL

Sr. Doc. Name Doc No. Issue date Project System 01 Compressed Air System Re-Qualification Report RQP-05725 Jul.,2025 Syrup Area 02 Compressed Air System Re-Qualification Report RQP-05825 Jul.,2025 Drops Area 03 Compressed Air System Re-Qualification Report RQP-05925 Jul.,2025  Stripping Area 04 Compressed Air System Re-Qualification Report RQP-06025 Jul.,2025 Bidalkin Area 05 Compressed Air System Re-Qualification Report RQP-06125 Jul.,2025 Tablet A Area 06 Compressed Air System Re-Qualification Report RQP-06225 Jul.,2025 Tablet D Area 07 Compressed Air System Re-Qualification Report RQP-06325 Jul.,2025 Tablet…