Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Installation Qualification (Production Building) IQP-H-05519 Dec.,2019 IQ 02 HVAC Operation Qualification (Production Building) OQP-H-10919 Dec.,2019 OQ 03 TESTING, ADJUSTING & BALANCING (Production Building) TAB- 11219 Dec.,2019 TAB 04 HVAC Installation Qualification (QC Building) IQP-H-05619 Dec.,2019 IQ 05 HVAC Operation Qualification (QC Building) OQP-H-11019 Dec.,2019 OQ 06 TESTING, ADJUSTING & BALANCING (QC Building) TAB- 11019 Dec.,2019 TAB 07 Turn Over Package (Production Building) TOP-01520 Dec.,2019 TOP 08 Turn Over…
Semco (Warehouse)-TAB
Sr. Doc. Name Doc. No. Issue date Project System 01 TESTING, ADJUSTING & BALANCING REPORT TAB-03820 15/11/2019 Warehouse (Block F)…
Misr Cosmatic-Qualification
Sr. Doc. Name Doc. No. Issue date Project System 01 Operation qualification Protocol OQP-L-01520 04/12/2019 Misr Cosmatic (Tunnel) 02 Operation qualification Annex OQP-L-01520/01 04/12/2019 Misr Cosmatic (Tunnel)…
Eva Cosmatic-TOP & Report
Sr. Doc. Name Doc. No. Issue date Project System 01 TOP & Report DR-00220 10/2019 TOP & Report…
Copad-Qualification
Sr. Doc. Name Doc. No. Issue date Project System 1 AIR CHANGE RATE TEST REPORT 32 Feb.,2020 Production, Store, Microbiology, Dispensing & Sampling Areas 2 AIR VISUALIZATION TEST REPORT (UDAF) 32 Feb.,2020 Production, Store, Microbiology, Dispensing & Sampling Areas 3 FILTER AIR VELOCITY VERIFICATION TEST REPORT 6 Feb.,2020 Production, Store, Microbiology, Dispensing & Sampling Areas 4 INSTALLED HEPA FILTER LEAK TEST REPORT 62 Feb.,2020 Production, Store, Microbiology, Dispensing & Sampling Areas…
SUEZ CANAL HOSPITAL -TAB
Sr. Doc. Name Doc. No. Issue date Project System 01 TESTING, ADJUSTING & BALANCING REPORT TAB-03720 01/03/2020 SUEZ CANAL HOSPITAL…
Pharma Egypt (ECAP)-LAF
Sr. Doc. Name Doc No. Issue date Project System 01 LAF Qualification Protocol & Annex OQP-L-01820 08/03/2020 LAF…
Uccma-TAB & Qualification (Sampling Area)
Sr. Doc. Name Doc No. Issue date Project System 01 Design Qualification Protocol & Annex for Sampling Area DQP-H-00820 20/03/2019 DQ 02 Testing, Adjusting & Balancing for Sampling Area TAB-03620 20/03/2019 TAB 03 Instillation Qualification Protocol & Annex for Sampling Area IQP-H-02320 20/03/2019 IQ 04 Operation Qualification Protocol & Annex for Sampling Area OQP-H-02920 20/03/2019 OQ 05 Turn Over Package for Sampling Area TOP-01320 20/03/2019 TOP…
Uccma-TAB & Qualification (Warehouse)
Sr. Doc. Name Doc No. Issue date Project System 01 Design Qualification Protocol & Annex for Warehouse DQP-H-00720 20/03/2019 DQ 02 Testing, Adjusting & Balancing for Warehouse TAB-00420 20/03/2019 TAB 03 Instillation Qualification Protocol & Annex for Warehouse IQP-H-01520 20/03/2019 IQ 04 Operation Qualification Protocol & Annex for Warehouse OQP-H-01620 20/03/2019 OQ 05 Turn Over Package for Warehouse TOP-01220 20/03/2019 TOP…
Uccma-TAB & Qualification (Dispensing Area)
Sr. Doc. Name Doc No. Issue date Project System 01 Design Qualification Protocol & Annex for Dispensing Area DQP-H-00320 20/03/2019 DQ 02 Testing, Adjusting & Balancing for Dispensing Area TAB-00420 20/03/2019 TAB 03 Instillation Qualification Protocol & Annex for Dispensing Area IQP-H-00420 20/03/2019 IQ 04 Operation Qualification Protocol & Annex for Dispensing Area OQP-H-00420 20/03/2019 OQ 05 Turn Over Package for Dispensing Area TOP-00920 20/03/2019 TOP…