Category: Uncategorized

MARCYRL PHARMA- Test Report

Sr. Doc. Name Doc No. Issue date Project Area 01 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-15721 June.,2021 Non-Sterile Area 02 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-16021 June.,2021 Non-Sterile Area…

MUP_ TAB

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing, Adjusting & Balancing Protocol TAB-19321 JUNE.,2021 (Water Network Equipment Performance), (AHUs Performance) 2 HVAC Testing, Adjusting & Balancing Annex TAB-19321/01 JUNE.,2021 (Water Network Equipment Performance), (AHUs Performance)…

Apex Pharma-Re-Qualification &TEST REPORT

Sr. Doc. Name Doc No. Issue date Project System 01 Compressed Gas System Re-Qualification Protocol (Protocol &Annex). RQP- G -00321 June,2021 Production Area 02 INSTALLED HEPA FILTER LEAK TEST REPORT (AHU-02) HLT-14421 June,2021 Production Area 03 INSTALLED HEPA FILTER LEAK TEST REPORT (AHU-03) HLT-14521 June,2021 Production Area 04 INSTALLED HEPA FILTER LEAK TEST REPORT (AHU-04) HLT-14621 June,2021 Production Area 05 INSTALLED HEPA FILTER LEAK TEST REPORT (AHU-05) HLT-14721 June,2021 Production Area 06 INSTALLED HEPA FILTER LEAK TEST REPORT (AHU-06) HLT-14821…

Al-Ebtikar -TAB

Sr. Doc. Name Doc No. Issue date Project System 01 Testing, Adjusting & Balancing  Air Flow Rate Test Report AFR-02121 JUNE.,2021   HVAC System 02 Testing, Adjusting & Balancing  Air Flow Rate Test Report AFR-02221 JUNE.,2021 HVAC System…

EGPI-Water balance

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Protocol TAB-19221 JUNE.,2021   Water Balance 02 HVAC Testing, Adjusting & Balancing Annex TAB-19221/01 JUNE.,2021 Water Balance…

Aswan University -TAB

Sr. Doc. Name Doc No. Issue date Project Area 01   Testing, Adjusting & Balancing Report   TAB-12721 June.,2021 ITI Building 02 PRE-TAB Review & TAB Functional Tests Data Sheets TAB-12721/01 June.,2021 ITI Building 03 Deviation Report & Attachments TAB-12721/02 June.,2021 ITI Building…

ALEXANDRIA UROLOGY HOSPITAL -TAB

Sr. Doc. Name Doc No. Issue date Project System 01 Testing, Adjusting & Balancing Report In Basement TAB-18421 Jan.,2021 Basement 02 Testing, Adjusting & Balancing Report In Ground TAB-18521 Jan.,2021 Ground Floor 03 Testing, Adjusting & Balancing Report In First Floor TAB-18621 Jan.,2021 First Floor 04 Testing, Adjusting & Balancing Report In Second Floor TAB-18721 Jan.,2021 Second Floor 05 Testing, Adjusting & Balancing Report In Third Floor TAB-18821 Jan.,2021 Third Floor 06 Testing, Adjusting & Balancing Report In Fourth floor…

AMOUN -LAF Qualification

Sr. Doc. Name Doc No. Issue date Project System 1 LAF Qualification OQP-L-03821 June.,2021 Strile Area 2 LAF Qualification OQP-L-04721 June.,2022 Strile Area 3 LAF Qualification OQP-L-04821 June.,2023 Strile Area 4 LAF Qualification OQP-L-04921 June.,2024 Strile Area…

EGYPHAR -OQ,TEST REPORT

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Qualification Report (Protocol &Annex). OQP-H-04121 May,2021 Solid 2 Area 02 HVAC Operation Qualification Report (Protocol &Annex). OQP-H-04121 May,2021 Liquid Area 03 AIR FlOW RATE TEST REPORT ACH-01521 May,2021 Solid 2 Area 04 AIR FlOW RATE TEST REPORT ACH-01621 May,2021 Liquid Area 05 ROOM PRESSURE DIFFERENCE TEST REPORT PDT-00821 May,2021 Solid 2 Area 06 ROOM PRESSURE DIFFERENCE TEST REPORT PDT-00921 May,2021 Liquid Area…