Sr. Doc. Name Doc No. Issue date Project System 01 Compressed Air Purity Test Report(Water Content Test) CAQ-00422/ CAQ-00622 Mar.,2022 Compressed Air…
GYPTO PHARMA (ZONE-LVP)
S.N Doc. Name Doc No. Issue date Project System 1 HVAC Design Qualification Protocol & Annex DQP-H-00222 Dec.2021 GYPTO PHARMA (ZONE-LVP) 2 HVAC Installation Qualification Protocol & Annex IQP-H-00522 Dec.2021 GYPTO PHARMA (ZONE-LVP) 3 HVAC Operation Qualification Protocol & Annex OQP-H-02222 Dec.2021 GYPTO PHARMA (ZONE-LVP) 4 HVAC Testing Adjusting & Balancing Protocol & Annex TAB-02722 Dec.2021 GYPTO PHARMA (ZONE-LVP) 5 Turn over Package TOP-00222 Dec.2021 GYPTO PHARMA (ZONE-LVP)…
GYPTO PHARMA (ZONE-Vial)
S.N Doc. Name Doc No. Issue date Project System 1 HVAC Design Qualification Protocol & Annex DQP-H-01621 Oct.2021 GYPTO PHARMA (ZONE-Vial) 2 HVAC Installation Qualification Protocol & Annex IQP-H-01121 Oct.2021 GYPTO PHARMA (ZONE-Vial) 3 HVAC Operation Qualification Protocol & Annex OQP-H-06921 Oct.2021 GYPTO PHARMA (ZONE-Vial) 4 HVAC Testing Adjusting & Balancing Protocol & Annex TAB-24721 Oct.2021 GYPTO PHARMA (ZONE-Vial) 5 HVAC Turn over package TOP-00821 Oct.2021 GYPTO PHARMA (ZONE-Vial)…
Al Andalous
Sr. Doc. Name Doc No. Issue date Project System 01 FILTER AIR VELOCITY VERIFICATION TEST REPORT From FVT-00822 To FVT-00922 Feb.,2022 Fuming Hood 02 AIR VISUALIZATION TEST REPORT (UDAF) From AVU-00722 To AVU-00822 Feb.,2022 Fuming Hood…
Safety science- Thermal mapping
Sr. Doc. Name Issue date Project System 01 Thermal mapping Protocol (Warehouse) Mar.2022 Warehouse…
Jedco-Micro Area
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Qualification Protocol OQP-H-02622 Mar.,2022 (AHU F-03) in First floor…
Hikma-Benisueif
Sr. Doc. Name Doc No. Issue date Project System 01 Air visualization test report AVU-00922 / AVU-01322 Mar.,2022 LAFs in Sampling, Dispensing & Microbiology lab…
Riyadh Pharma-Validation Protocol (Autoclave)
Sr. Doc. Name Issue date Project System 01 Validation Protocol Feb.2022 Sterile Department…
Nazli Hotel ( Total Air)
Sr. Doc. Name Doc. No Issue date Project System 01 FCU Performance & Traverse Measurements Test Report APT-00122 March 2022 CR-12-A 02 FCU Performance & Traverse Measurements Test Report APT-00222 March 2022 CR-16-A 03 AIR DISTRIBUTION SYSTEM BALANCE TEST REPORT ACH-04222 March 2022 CR-12-A & CR-16-A 04 SOUND LEVEL MEASUREMENT TEST REPORT SLM-00122 March 2022 CR-12-A 05 SOUND LEVEL MEASUREMENT TEST REPORT SLM-00222 March 2022 CR-16-A…
Eipico (Animal house)-TAB & Qualification
Sr. Doc. Name Doc. No Issue date Project System 01 Installation Qualification Volume 01 of 03 IQP-H-00722 Dec 2021 AHU-01,02,EXF-01 02 Testing, Adjusting & Balancing Report Volume 02 of 03 TAB-02922 Dec 2021 AHU-01,02,EXF-01 03 Operation Qualification Report Volume 03 of 03 OQP-H-02522 Dec 2021 AHU-01,02,EXF-01 04 Design Qualification Report DQP-H-00422 Dec 2021 AHU-01,02,EXF-01…