Category: Uncategorized

Sedico-sterile LAF

Sr. Doc. Name Doc. No Issue date Project System 01 LAF Operation Re-Qualification Report RQP-L-07222 Aug 2022 Filling Line 4/ St-33…

Zewail

Sr. Doc. Name Doc No. Issue date Project System 1  HVAC Operation Qualification Report OQP-H-06322 JULY,2022 (AHUs-01,02, 02’,06)…

East Delta Contracting-Starbucks

Sr. Doc. Name Doc. No Issue date Project System 01 AIR DISTRIBUTION SYSTEM BALANCE TEST REPORT ACH-06022 Aug 2022 FCU-1/1,2, FCU-2, FCU-3 02 WATER FLOW RATE MEASUREMENTS TEST REPORT WBR-00122 Aug 2022 FCU-1/1,2, FCU-2, FCU-3…

Otsuka Egypt-compressed gas

Sr. Doc. Name Doc. No Issue date Project System 01 Compressed Gas System Operation Qualification Report RQP-G-01622 Aug 2022 Large Volume Line & Ampoule Areas…

SEDICO (Solid Area)

S.N Doc. Name Doc No. Issue date Project System 1         HVAC Operation Re-Qualification  Protocol & Annex RQP-H-06022 Aug.2022 SEDICO (SOLID-Tablet area)…

GSK El-Salam

Sr. Doc. Name Doc. No Issue date Project System 01 AS FOUND AHU PERFORMANCE MEASUREMENTS REPORT APT-00822 June 2022 AHUs-02 & 05 02 AS-FOUND AIR CHANGE RATE TEST REPORT ACH-05922 June 2022 03 AS-FOUND ROOM PRESSURE DIFFERENCE TEST REPORT PDT-01422 June 2022 04 AS-FOUND ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-02522 June 2022   AHUs-02 & 05…

Jedco-1

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Performance Qualification Protocol OQP-H-06222 Aug.,2022 Semi-solid 2 HVAC Performance Qualification Protocol OQP-H-06322 Aug.,2022 solid 3 lAF RE-Qualification Protocol RQP-L -06722 Aug.,2022 LAF /P-OC-01 3 lAF RE-Qualification Protocol RQP-L-06622 Aug.,2022 LAF /Q-MI -04 3 lAF RE-Qualification Protocol RQP-L-06522 Aug.,2022 Weighing Booth/W-RM-04…