Sr. Doc. Name Doc.No Issue date Project system 1 TESTING, ADJUSTING & BALANCING REPORT APT-08925 Aug., 2025 AHU-01-B04…
(SEMOHA TOURISTIC CENTER) work in (Green Plaza Hotel)
Sr. Doc. Name Doc.No Issue date Project system 1 WATER FLOW RATE MEASUREMENTS REPORT WBR-001225 Aug., 2025 CHILLED WATER SYSTEM…
Nerhadou-Chilled Water Sytem
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Installation Qualification Report IQP-H- 03025 Jul., 2025 Chiller 4 02 Chiller Performance Report CPT – 00125 Jul., 2025 Chiller 4…
FPI
Sr. Doc. Name Doc No. Issue date Project System 01 INSTALLED TERMINAL HEPA FILTER LEAK TEST REPORT FOR (SGBS ROOM) HLT-12425 Aug., 2025 Solid Area 02 INSTALLED TERMINAL HEPA FILTER LEAK TEST REPORT (WEIGHING BOOTH / 12494-1) HLT-12525 Aug., 2025 Sampling area 03 INSTALLED TERMINAL HEPA FILTER LEAK TEST REPORT (WEIGHING BOOTH / 12494-2 HLT-12625 Aug., 2025 Dispensing area 04 INSTALLED TERMINAL HEPA FILTER LEAK TEST REPORT (WEIGHING BOOTH / 12494-3 HLT-12725 Aug., 2025 Sampling area 05 INSTALLED TERMINAL HEPA…
EL-SAFA HOSPITAL
Doc. Name Doc. No. Issue Date Area AHU PERFORMANCE MEASUREMENTS TEST REPORT (AHU-03) APT-08825 Aug.,2025 Operating Room 4…
(UNILEVER) work in (ENZYME ROOM)
Sr. Doc. Name Doc.No Issue date Project system 1 Down Flow Booth RE-QUALIFICATION Report RQP-L-23025 Aug,2025 Down Flow Booth/2001869…
Apex Pharma
Sr. Doc. Name Doc No. Issue date Project System 01 AIR CHANGE RATE VERIFICATION TEST REPORT ACH-02835 Aug., 2025 AHU-15 02 ROOM PRESSURE DIFFERENCE VERIFICATION TEST REPORT PDT-01925 Aug., 2025 AHU-15 03 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-04025 Aug., 2025 AHU-15 04 AIR VISUALIZATION TEST REPORT AVN-02425 Aug., 2025 AHU-15 05 AIR BORNE PARTICLE COUNT TEST REPORT PCR-07025 Aug., 2025 AHU-15 06 RECOVERY RATE TEST REPORT RRT-13225 Aug., 2025 AHU-15…
ADCO Aerosol
Note that it’s for ADCO ) works in Aerosol Area Sr. Doc. Name Doc No. Issue date Project System 1 HVAC RE-QUALIFICATION PROTOCOL RQP-H-19325 Jul,2025 Re-Qualification…
Saleh Dafer Al-Sagoor Contracting Est. – Qatif Central Prison – TAB
Sr. Doc. Name Issue date Doc. No. Area 01 HVAC TESTING, ADJUSTING & BALANCING PROTOCOL (AIR SIDE) Protocol & Annex Aug.,2025 TAB-H-02325 Prisoners’ Building 02 HVAC TESTING, ADJUSTING & BALANCING PROTOCOL (AIR SIDE) Protocol & Annex Aug.,2025 TAB-H-02425 Administrative Building…
Arabcomed-Incubator (421507102)
Sr. Doc. Name Doc. No. Issue Date Item Name 01 INSPECTION CERTIFICATE PQ-048-2025 Aug.,2025 Incubator (421507102) 02 PERFORMANCE QUALIFICATION PROTOCOL PQP-M-02825 Aug.,2025 03 PERFORMANCE QUALIFICATION REPORT PQR-M-02825 Aug.,2025…