Category: Uncategorized

Vitabiotic – Test, Balance & Qualification

Sr. Doc. Name Issue date Project System 01 TESTING, ADJUSTING & BALANCING protocol &Annex July,2020 WAREHOUSE 02 TESTING, ADJUSTING & BALANCING protocol &Annex Aug. 2020 Microbiology 03 Operation Qualification protocol &Annex…

Semco-ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT

Sr. Doc. Name Doc. No Issue date Project System 01  ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-00220 Jan,2020 Block B – First Floor 02 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-00120 Jan,2020 Block B – Ground Floor 03 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-00320 Jan,2020 Block F…

ORASCOM – TAB works

Sr. Doc. Name Doc. No Issue date Project System 01 TAB Report – Vol.01 TAB-17220 Aug, 2020 TAB 02 TAB Report -Annex-01.01 TAB-17220/01 Aug, 2020 TAB 03 TAB Report -Annex-01.02 TAB-17220/02 Aug, 2020 TAB…

Dawana Misr (Mirage Building) project _ Qualification

Sr. Doc. Name Issue date Project System 01 IQ Qualifications Aug.,2020 AHU-01 02 IQ Qualifications Aug.,2020 AHU-02 03 IQ Qualifications Aug.,2020 AHU-03 04 IQ Qualifications Aug.,2020 AHU-04 05 IQ Qualifications Aug.,2020 AHU-05 06 IQ Qualifications Aug.,2020 AHU-06 07 IQ Qualifications Aug.,2020 AHU-07 08 IQ Qualifications Aug.,2020 AHU-08 09 IQ Qualifications (Water Side) Aug.,2020 Water IQ 10 Turn Over package Aug.,2020 Mirage Building 11 Design Qualification Aug.,2020 Mirage Building…

NILE BADRAWI HOSPITAL project -Qualification

Sr. Doc. Name Issue date Project Area 01 Performance Qualification Protocol July,2020 basement Floor 02 Performance Qualification Test Results July,2020 basement Floor 03 Performance Qualification Protocol July,2020 10 th Floor 04 Performance Qualification Test Results July,2020 10 th Floor 05 Performance Qualification Protocol July,2020 11 th Floor 06 Performance Qualification Test Results July,2020 11 th Floor…

Saudi German Hospitals _ Qualification

Sr. Doc. Name Issue date Project Area 01 Performance Qualification Protocol July,2020 Compressor Room 02 Performance Qualification Test Results July,2020 Compressor Room 03 Performance Qualification Protocol July,2020 3rd Floor 04 Performance Qualification Test Results July,2020 3rd Floor…

Liptis – TAB & Qualification

Sr. Doc. Name Issue date Project Area 01 INSTALLED HEPA FILTER LEAK TEST REPORT Aug., 2020 Sampling & Weighing Area 02 INSTALLED HEPA FILTER LEAK TEST REPORT Aug., 2020 Coating Room 03 FAN PERFORMANCE TEST REPORT Aug., 2020 Sampling & Weighing Area 04 FAN PERFORMANCE TEST REPORT Aug., 2020 Coating Room 05 DUCT TRAVERSE TEST REPORT Aug., 2020 Sampling & Weighing Area 06 DUCT TRAVERSE TEST REPORT Aug., 2020 Coating Room…