Sr. Doc. Name Issue date Doc. No. Area 01 LAF Re-Qualification (Protocol & Annex) (QCE-020) Aug., 2025 RQP-L-10125 Micro Area 02 Bio Safety Cabinet Re-Qualification (Protocol & Annex) (QCE-021) Aug., 2025 RQP-L-10225 Micro Area 03 Pass box Re-Qualification (Protocol & Annex) (QCE-045) Aug., 2025 RQP-L-10325 Micro Lab Area 04 Sampling Booth Re-Qualification (Protocol & Annex) (QCE-039) Aug., 2025 RQP-L-10425 Sampling Area 05 Weighing Booth Re-Qualification (Protocol & Annex) (W.H-36A) Aug., 2025 RQP-L-10525 Dispensing Area 06 Weighing Booth Re-Qualification (Protocol &…
EGYPHAR-1/SOFT GELATINE AREA
Doc. Name Doc. No. Issue Date Area HVAC Re-Qualification Protocol RQP-H-20425 Aug., 2025 Soft Gelatine Area HVAC Re-Qualification Results Data Sheets RQP-H-20425/01 Aug., 2025 Soft Gelatine Area HVAC Re-Qualification Results Data Sheets RQP-H-20425/02 Aug., 2025 Soft Gelatine Area HVAC Re-Qualification Results Data Sheets RQP-H-20425/03 Aug., 2025 Soft Gelatine Area HVAC Re-Qualification Results Data Sheets RQP-H-20425/04 Aug., 2025 Soft Gelatine Area HVAC Re-Qualification Results Data Sheets RQP-H-20425/05 Aug., 2025 Soft Gelatine Area HVAC Re-Qualification Results Data Sheets RQP-H-20425/06 Aug., 2025 Soft…
Chemotherapy Preparation Room-Operation Qualification-SAUDI GERMAN HOSPITALS-KSA
Sr. Doc. Name Issue date Doc. No. Area 01 HVAC Operation Qualification Protocol & Annex (AHU-01) Aug.,2025 OQP-H-06525 Chemotherapy Preparation Room…
Sunny Pharmaceutical
Doc. Name Doc. No. Issue Date Area HVAC Re-Qualification Protocol RQP-H-20525 Aug.,2025 Dispensing Area Pass Box Re-Qualification Protocol RQP-L-24325 Aug.,2025 Dispensing Area Dispensing Booth Re-Qualification Protocol RQP-L-24425 Aug.,2025 Dispensing Area…
Nerhadou
Sr. Doc. Name Doc No. Issue date Project System 01 SAMPLING BOOTH RE-QUALIFICATION REPORT RQP-L-24125 Aug., 2025 Sampling Area 02 DISPENSING BOOTH RE-QUALIFICATION REPORT RQP-L-24225 Aug., 2025 Dispensing Area…
ALANDALOUS
Sr. Doc. Name Doc No. Issue date Project System 01 Sampling Booth Re-Qualification Report RQP-L-23525 Aug., 2025 Sampling Area 02 Pass Boxes Re-Qualification Report RQP-L-23625 Aug., 2025 Micro Area 03 Safety Cabinet Re-Qualification Report RQP-L-23725 Aug., 2025 Micro Area 04 Safety Cabinet Re-Qualification Report RQP-L-23925 Aug., 2025 R & D Area 05 Isolator Re-Qualification Report RQP-L-24025 Aug., 2025 Dispensing Area 06 Weighing Booth Re-Qualification Report RQP-L-26425 Aug., 2025 Dispensing Area 06 Air Velocity Verification Test Report FHV-00125 Aug., 2025 Micro…
EGYPHAR
Sr. Doc. Name Doc No. Issue date Project System 01 LAF RE-QUALIFICATION REPORT RQP-L-23825 Aug., 2025 Dispensing Area…
protech
Note that it’s for PROTECH ) works in Production Area Sr. Doc. Name Doc No. Issue date Project System 1 PASS BOXES INSTALLATION QUALIFICATION PROTOCOL IQP-L-20325 Aug,2025 Installation Qualification…
GASCO
Sr. Doc. Name Doc.No Issue date Project system 1 WATER FLOW RATE MEASUREMENTS TEST REPORT WBR-01025 Aug., 2025 Water Side…
PROTECH
Note that it’s for PROTECH ) works in Production Area Sr. Doc. Name Doc No. Issue date Project System 1 PASS BOXES OPERATION QUALIFICATION PROTOCOL OQP-H-20325 Aug,2025 Operation Qualification…