Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex RQP-H-06923 May.,2023 Sterile 2 LAFs Operation Re- Qualification Protocol RQP-L-05523 May.,2023 Sterile 3 Pass Boxes Operation Re-Qualification Protocol RQP-L-05523 May.,2023 Sterile 4 Compressed Gas System Performance Re-Qualification Report RQP-G-01023 May.,2023 Sterile 5 LUX MEASUREMENTS VERIFICATION TEST REPORT LMR-01523 May.,2023 Sterile…
Sedico
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex RQP-H-07823 May.,2023 Soft gelatine 2 HVAC Testing, Adjusting & Balancing Protocol& Annex TAB-06323 May.,2023 Soft gelatine…
Jedco
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex OQP-H-08123 June.,2023 AHUs (F03) Micro Area 2 INSTALLED HEPA FILTER LEAK TEST REPORT OQP-H-08223 June.,2023 AHUs (F01) QC Area 3 Compressed Air System Re-Qualification Protocol RQP-G-01923 June.,2023 compressed…
al andalous
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex RQP-H-06223 May. ,2023 AHUs (14&21) Solid Area 2 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-06923 May. ,2023 AHUs (2) Semi Solid Area 3 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-07023 May. ,2023 AHUs (10) Semi Solid Area…
Kahira pharmaceutical
Sr. Doc. Name Doc No. Issue date Project System 1 Installation Qualification Protocol & Annexes IQP-H-01323 June, 2023 Whole factory 2 Testing, Adjusting & Balancing Protocol & Annex TAB-06423 June, 2023 Chilled & Hot Water System 3 Performnace Qualification Protocol & Annexes PQP-H-00523 July,2023 Whole factory 4 AHU Operation Qualification Protocol & Annexes OQP-08323 July,2023 Whole factory …
(Weighing Booth) Works in (UNILEVER)
Sr. Doc. Name Doc No. Issue date Project System 01 Weighing Booth Operation Qualification Protocol & Annex RQP-L-09023 July,2023 Down Flow Booth…
(Utopia) Works in (Production Area)
Sr. Doc. Name Doc No. Issue date Project System HVAC Operation Re-Qualification Report RQP-H-07623 May.2023 Production Area…
(El Razy) Works in (LAFs & Compressed System)
Sr. Doc. Name Doc No. Issue date Project System Compressed Gas System Operation Re-Qualification Protocol & Annex RQP-G-00723 May, 2023 Production Area LAF Operation Re-Qualification Protocol & Annex RQP-L-05823 May, 2023 Micro lab LAF Pass Box Operation Re-Qualification Protocol & Annex RQP-L-05923 May, 2023 Sampling Area LAF Operation Re-Qualification Protocol & Annex RQP-L-06023 May, 2023 Sampling Area LAF Operation Re-Qualification Protocol & Annex RQP-L-06123 May, 2023 Sterile Area Weighing Booth Operation Re-Qualification Protocol &…
Otsuka-compressed air
Sr. Doc. Name Doc No. Issue date Project System 1 Compressed Air System Operation Re-Qualification Report OQP-G-00623 May. ,2023 compressed…
(Otsuka Ateco)
Sr. Doc. Name Doc No. Issue date Project System 01 AIR VELOCITY VERIFICATION TEST REPORT AVN-05423 June,2023 Chemical Lab 02 AIR VISUALIZATION TEST REPORT AVN-05523 June,2023 Chemical Lab…