Alex Pharma

Sr. Doc. Name Doc. No Issue date Project System
01 Testing, Adjusting & Balancing Report – Volume 01 of 02 TAB-25221 Sep, 2021 TAB/ Air side
02 Testing, Adjusting & Balancing Report -Annex-01.01 TAB-25221/01 Sep, 2021 TAB/ Air side
03 Testing, Adjusting & Balancing Report – Volume 02 of 02 TAB-25321 Sep, 2021 TAB/ Water side
04 Testing, Adjusting & Balancing Report -Annex-02.01 TAB-25321/01 Sep, 2021 TAB/ Water side
01 Installation Qualification Protocol – Volume 01 of 02 IQP-H-01221 Sep, 2021 Installation Qualification
02 Installation Qualification Protocol – Annex-01.01 IQP-H-01221/01 Sep, 2021 Installation Qualification
01 Operation Qualification Report – Volume 02 of 02 OQP-H-07821 Sep, 2021 Operation Qualification
02 Operation Qualification Report – Annex-02.01 OQP-H-07821 /01 Sep, 2021 Operation Qualification

Write a comment