Sr. | Doc. Name | Doc. No | Issue date | Project system |
1 | AIR CHANGE RATE TEST REPORT | ACH-02625: ACH-02725 | July, 2025 | المحاليل |
2 | ROOM PRESSURE DIFFERENCE TEST REPORT | PDT-01525: PDT-01625 | July, 2025 | المحاليل |
3 | ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT | TRH-03425: TRH-03525 | July, 2025 | المحاليل |
4 | AIR FLOW VISUALIZATION TEST FOR NON UDAF TEST REPORT | AVN-01425: AVN-01525 | July, 2025 | المحاليل |
5 | AIR BORNE PARTICLE COUNT TEST REPORT | PCR-06425: PCR-06525 | July, 2025 | المحاليل |
6 | RECOVERY RATE TEST REPORT | RTT-12525: RTT-12625 | July, 2025 | المحاليل |
7 | INSTALLED ABSOLUTE HEPA FILTER LEAK TEST REPORT | HLT-07825: HLT-07925 | July, 2025 | المحاليل |
8 | INSTALLED TERMINAL HEPA FILTER LEAK TEST REPORT | HLT-08025: HLT-08125 | July, 2025 | المحاليل |