| Sr. | Doc. Name | Doc No. | Issue date | Project System |
| 01 | HVAC Installation Qualification Report | IQP-H-03124 | Jul.,2024 | Production Area |
| 02 | HVAC Testing, Adjusting & Balancing Report | TAB-07024 | Jul.,2024 | Production Area |
| 03 | HVAC Operation Qualification Report | OQP-H-10724 | Aug.,2024 | Production Area |
| 04 | LAFs Operation Qualification Report | OQP-L-19924 | Aug.,2024 | Production Area |
| 05 | Pass Boxes Operation Qualification Report | OQP-L-20024 | Aug.,2024 | Production Area |