KSA-ALPHA PHARMA-Units Re-Qualification

Sr.Doc. NameDoc. No.Issue dateProject System
1Pass Throughs Operation Re-Qualification ProtocolRQP-L-03124May, 2024PT.10, PT.11, PT.12, PT.13, PT.14, PT.15, PT.21, PT.22, PT.23 & PT.24
2Dispensing Booth-1 Operation Re-Qualification ProtocolRQP-L-03224May, 2024Dispensing Booth-1  (30160003)
3Dispensing Booth-2 Operation Re-Qualification ProtocolRQP-L-03324May, 2024Dispensing Booth-2  (30140003)
4Sampling Booth Operation Re-Qualification ProtocolRQP-L-03424May, 2024Sampling Booth (30140001)
5INSTALLED HEPA FILTER LEAK TEST REPORTHLT-02524 to HLT-02924May, 2024Air Shower 11
Air Shower 13
FBD AHU
IMA Coater
Sejong Coater

Write a comment