Sr. | Doc. Name | Doc No. | Issue date | Project System |
01 | Fcu’s Performance Measurements Test Report | APT-01923 | May,2023 | Mezzanine & Plaza Floor |
02 | Supply Air Flow Rate Test Report (Mezzanine Floor) | AFR-00223 | May,2023 | Mezzanine Floor |
03 | Supply Air Flow Rate Test Report (Plaza Floor) | AFR-00323 | May,2023 | Plaza Floor |
04 | FAF Performance & Traverse Measurements Test Report | FPT-00623 | May,2023 | Mezzanine & Plaza Floor |
05 | Air Flow Rate Test Report For Fresh Air (Mezzanine Floor) | AFR-00423 | May,2023 | Mezzanine Floor |
06 | Air Flow Rate Test Report For Fresh Air (Plaza Floor) | AFR -00523 | May,2023 | Plaza Floor |
07 | Pump Performance Test Report (Chilled Water System) | WPT-01723 | May,2023 | Mezzanine & Plaza Floor |
08 | Pump Performance Test Report (Hot Water System) | WPT-01823 | May,2023 | Mezzanine & Plaza Floor |
09 | Water Flow Rate Measurments Test Reports (Chilled Water System) | WBR-00623 | May,2023 | Mezzanine & Plaza Floor |
10 | Water Flow Rate Measurments Test Reports (Hot Water System) | WBR-00723 | May,2023 | Mezzanine & Plaza Floor |
11 | Sound Level Measurments Test Reports | SLM-00123 | May,2023 | Mezzanine & Plaza Floor |