Sr. | Doc. Name | Doc No. | Issue date | Project System |
01 | HVAC Installation Qualification (Production Building) | IQP-H-05519 | Dec.,2019 | IQ |
02 | HVAC Operation Qualification (Production Building) | OQP-H-10919 | Dec.,2019 | OQ |
03 | TESTING, ADJUSTING & BALANCING (Production Building) | TAB- 11219 | Dec.,2019 | TAB |
04 | HVAC Installation Qualification (QC Building) | IQP-H-05619 | Dec.,2019 | IQ |
05 | HVAC Operation Qualification (QC Building) | OQP-H-11019 | Dec.,2019 | OQ |
06 | TESTING, ADJUSTING & BALANCING (QC Building) | TAB- 11019 | Dec.,2019 | TAB |
07 | Turn Over Package (Production Building) | TOP-01520 | Dec.,2019 | TOP |
08 | Turn Over Package (QC Building) | TOP-01620 | Dec.,2019 | TOP |