Copad-Qualification

Sr. Doc. Name Doc. No. Issue date Project System
1 AIR CHANGE RATE TEST REPORT 32 Feb.,2020 Production, Store, Microbiology, Dispensing & Sampling Areas
2 AIR VISUALIZATION TEST REPORT (UDAF) 32 Feb.,2020 Production, Store, Microbiology, Dispensing & Sampling Areas
3 FILTER AIR VELOCITY VERIFICATION TEST REPORT 6 Feb.,2020 Production, Store, Microbiology, Dispensing & Sampling Areas
4 INSTALLED HEPA FILTER LEAK TEST REPORT 62 Feb.,2020 Production, Store, Microbiology, Dispensing & Sampling Areas