Note that it’s for (JAMJOOM PHARMA) works in (STRILE AREA) Sr. Doc. Name Doc No. Issue date Project System 01 Pass Boxes Re-Qualification Report RQP-L-13925 May, 2025 STRILE AREA 02 LAFs Re-Qualification Report RQP-L-14625 May, 2025 STRILE AREA…
AL RAZY-COMPRESSED & UNITS
Note that it’s for (AL RAZY PHARMA) works in (production, sampling, micro & weighing area) Sr. Doc. Name Doc No. Issue date Project System 01 Pass Box Re-Qualification Report RQP-L-14525 Jun., 2025 sampling area 02 weighing booth Re-Qualification Report RQP-L-14425 Jun., 2025 weighing area 03 LAF Re-Qualification Report RQP-L-14025 Jun., 2025 micro area 04 LAF Re-Qualification Report RQP-L-14125 Jun., 2025 sampling area 05 Safety cabinet Re-Qualification Report RQP-L-14225 Jun., 2025 micro area 06 Compressed Air System Re- Qualification Report RQP-G-03825…
AL Amin Medical
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC TESTING, ADJUSTING & BALANCING REPORT TAB-04625 May., 2025 AHU03, AHU04&AHU05…
AL-NASR
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC RE-QUALIFICATION REPORT RQP-H- 10125 June, 2025 (AHU-04, AHU-05&AHU-06) 2 WEIGHING BOOTHS RE-QUALIFICATION REPORT RQP-H- 14325 June, 2025 …
UTOPIA PHARMACEUTICAL-MICROBIOLOGY AREA
Doc. Name Doc. No. Issue Date Area HVAC Re-Qualification Protocol RQP-H-09925 May, 2025 Microbiology Area HVAC Re-Qualification Results Data Sheets RQP-H-09925/01 Jun., 2025 Microbiology Area…
Multiacre
Sr. Doc. Name Doc.No Issue date Project system 1 COMPRESSED AIR SYSTEM INSTALLATION QUALIFICATION REPORT IQP-G- 00325 May, 2025 Compressed Air 2 May.2025 3 May.2025 4 May.2025 5 May.2025 …
JEDCO INTERNATIONAL PHARMACEUTICALS CO.-PRODUCTION AREA
Doc. Name Doc. No. Issue Date Area Compressed Air System Re-Qualification Protocol RQP-G-03725 May, 2025 Production Area Compressed Air System Re-Qualification Results Data Sheets RQP-G-03725/01 May, 2025 Production Area…
Klybeck-T-Cold Room (VPR/E/265)
Sr. Doc. Name Doc. No. Issue Date Item Name 01 INSPECTION CERTIFICATE PQ-158-2025 May.,2025 Cold Room (VPR/E/265) 02 PERFORMANCE QUALIFICATION PROTOCOL PQP-T-08125 Apr., 2025 03 PERFORMANCE QUALIFICATION REPORT PQR-T-08225 May., 2025…
KLYBECK – RE-QUALIFICATION
Sr. Doc. Name Issue date Doc. No. Area 01 Isolators Re-Qualification Protocol & Annexes May, 2025 RQP-L-06125 Animal House Area 02 Room Temperature and Relative Humidity Test Report (AHU-47A) May, 2025 TRH-00125 Warehouse Area 03 Room Temperature and Relative Humidity Test Report (AHU-47B) May, 2025 TRH-00225 Warehouse Area 04 Room Temperature and Relative Humidity Test Report (AHU-15) May, 2025 TRH-00325 Packaging Area 05 Installed HEPA Filter Leak Test Report (AHU-15) May, 2025 HLT- 00125 Packaging Area 06 Installed HEPA Filter…
IAQ Report (ZONE5-5)-AMANA-Red Sea Development-9D-(3H)
Doc. Name Doc. No. Issue Date Area amaala staff village-zone 5 IAQ-H-01525 May.2025 Cluster -2…