Author: Ramy Zyada

(Jamjoom) RQ-2023

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annexes RQP-H-13123 Dec.,2023 Sterile Area 2.   HVAC Operation Re-Qualification Protocol& Annexes RQP-H-13223 Dec.,2023 Dispensing Area 3.   HVAC Operation Re-Qualification Protocol& Annexes RQP-H-13323 Dec.,2023 Solid Area 4.   HVAC Operation Re-Qualification Protocol& Annexes RQP-H-13423 Nov.,2023 Micro Area 5.   LAFs Operation Qualification Protocol& Annexes RQP-L-22523 Dec.,2023 Sterile Area 6.   Pass Boxes Operation Qualification Protocol& Annexes RQP-L-22623 Dec.,2023 Sterile Area 7.   LAFs Operation Qualification…

Sharm Pharma (Ground&2nd floor)

Sr. Doc. Name Doc No. Issue date Project System 1   HVAC  Installation Qualification  Protocol & Annexes for Ground Floor IQP-H-02623 Dec.,2023 Ground Floor 2   HVAC  Installation Qualification  Protocol & Annexes for Second Floor IQP-H-02723 Dec.,2023 Second Floor…

(APEX) Works

Sr. Doc. Name Doc No. Issue date Project System   1 Compressed Nitrogen System Operation Qualification Protocol& Annexes RQP-G-03323 Nov.,2023 Compressed 2   LAF Operation Re-Qualification Protocol& Annexes RQP-L-191-23 Nov.,2023 Micro Lab 3   Safety Cabinet Operation Re-Qualification Protocol& Annexes RQP-L-19223 Nov.,2023 Micro Lab  4 Weighing Booth Operation Re-Qualification Protocol& Annexes RQP-L-19323 Nov.,2023 Sampling Room 5   INSTALLED HEPA FILTER LEAK TEST REPORTs HLT-15323 : HLT-15923 Nov.,2023 Sampling Area…

(MultiCare) Hard Gelatin

Sr. Doc. Name Doc No. Issue date Area 1.   Operation Qualification Protocol & Annexes OQP-H-13023 Nov.,2023 Hard Gelatin Area 2.   ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-01523 Nov.,2023 Hard Gelatin Area 3.   AIR VISUALIZATION TEST REPORT AVN-06623 Nov.,2023 Hard Gelatin Area 4.   AIR BORNE PARTICLE COUNT TEST REPORT PCR-04323 Nov.,2023 Hard Gelatin Area 5.   RECOVERY RATE  TEST REPORT RTT-13723 Nov.,2023 Hard Gelatin Area…