Author: Ramy Zyada

(TEST REPORTS) Works in (EL KAHIRA PHARM)

Sr. Doc. Name Doc No. (From) Doc No. (TO) Issue date Project System 01 AIR CHANGE ADJUSTMENT TEST REPORT ACH-06323 ACH-06623 Dec,2023 Liquid Sterile 02 ROOM PRESSURE DIFFERENCE TEST REPORT PDT-02023 PDT-02323 Dec,2023 Liquid Sterile 03 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT TRH-01723 TRH-01923 Dec,2023 Liquid Sterile 04 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-17723 HLT-17923 Dec,2023 Liquid Sterile 05 AIR VISUALIZATION TEST REPORT (NUDAF) AVN-08323 AVN-08523 Dec,2023 Liquid Sterile 06 AIR BORNE PARTICLE COUNT TEST REPORT PCR-04723 PCR-04923…

SHAR (KSA)-Enclosure Integrity Test Report

Sr. Doc. Name Issue date Project System 01 Enclosure Integrity Test for Electrical Room Building-01 Dec., 2023 Neom Port Temporary Facilities 02 Enclosure Integrity Test for Electrical Room Building-02 Dec., 2023 Neom Port Temporary Facilities 03 Enclosure Integrity Test for Telecom Room – Building 01 Dec., 2023 Neom Port Temporary Facilities 04 Enclosure Integrity Test for Telecom Room – Building 02 Dec., 2023 Neom Port Temporary Facilities 05 Enclosure Integrity Test for It Room – Building 01 Dec., 2023 Neom…

(Sanofi)

Sr. Doc. Name Doc No. Issue date Project System   HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement)   TAB-11223 Dec.,2023 AHU-09   HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11323 Dec.,2023 AHU-12   HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11423 Dec.,2023 AHU-14   HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11523 Dec.,2023 AHU-ZMSA   HVAC Testing, Adjusting & Balancing Report (Before Balancing measurement) TAB-11623 Dec.,2023 AHU-ZMDI   HVAC Testing, Adjusting &…

AL-ROWAD

Sr. Doc. Name Doc No. Issue date Project System 01 Operation Qualification Report OQP-H-14223 Dec,2023 Production, Dispensing, and Sampling Areas 02 Installation Qualification Report IQP-H-02923 Dec,2023 Production, Dispensing, and Sampling Areas 03 Testing, Adjusting, and Balancing Report TAB-11123 Dec,2023 Production, Dispensing, and Sampling Areas…

(HVAC Qualification) Works in (KAHIRA PHARM-Proximol Area.)

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Installation Qualification Protocol & Annex IQP-H-02323 Nov,2023 Proximol Area 02 HVAC Operation Qualification Protocol & Annex OQP-H-13623 Nov,2023 Proximol Area 03 HVAC Performance Qualification Protocol & Annex (Revision 01) PQP-H-00923 Nov,2023 Proximol Area 04 HVAC Performance Qualification Protocol & Annex (Revision 02) PQP-H-01023 Nov,2023 Proximol Area…

EL SWEDEY ELECTRIC

Sr. Doc. Name Doc No. (From) Doc No. (TO) Issue date Project System 01 FAN PERFORMANCE TEST REPORTs FPT-01323 FPT-02123 Dec,2023 GIS Building 02 AIR FLOW RATE TEST REPORT AFR-01623 – Dec,2023 GIS Building 03 ROOM PRESSURE DIFFERENCE TEST REPORT PDT-01923 – Dec,2023 GIS Building…

DAR EL Maamar

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report For (صحة الحيوان) TAB-11023 Des.,2023 صحة الحيوان 02 Room Temperature and Relative Humidity Test Report For (صحة الحيوان) TRH-1623 Des.,2023 صحة الحيوان 03 Air Visualization Test Report For (صحة الحيوان) AVN-07723 Des.,2023 صحة الحيوان…