Author: Ramy Zyada

(Operation Re-Qualification) Works in (Otsuka Al-Obour)

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Protocol & Annex RQP-H-14423 Dec,2023 Large volume parenteral Line 02 HVAC Operation Re-Qualification Protocol& Annex (In Operation) RQP-H-14523 Dec,2023 Large volume parenteral Line 03 AIR CHANGE ADJUSTMENT TEST REPORT From: ACH-00124       To: ACH-00224 Jan,2024 Large volume parenteral Line 04 ROOM PRESSURE DIFFERENCE TEST REPORT From: PDT-00224       To: PDT-00324 Jan,2024 Large volume parenteral Line 05 ROOM TEMPERATURE AND RELATIVE HUMIDITY TEST REPORT From: TRH-00124       To:…

(LAFs Operation Re-Qualification) Works in (SERVIER)

Sr. Doc. Name Doc No. Issue date Project System 01 Sampling Booth (VB-1900) Operation Re-Qualification Protocol & Annex RQP-L-00224 Jan,2024 Sampling Area 02 Weighing Booth (LF-3000) Operation Re-Qualification Protocol & Annex RQP-L-00324 Jan,2024 Weighing Area 03 Safety Cabinet (QC-083) Operation Re-Qualification Protocol & Annex RQP-L-00424 Jan,2024 Microbiology Area…

GULF GP-NEOM TAB KSA

Sr. Doc. Name Doc. No Issue date Project System 1 TAB REPORT (FOR FAHU1) TAB-000124 Jan.2024 TAB PROJECT 2 FAHU-ANNEX-01 TAB-000124/01 Jan.2024 TAB PROJECT 3 FAHU-ANNEX-02 (Dev. & Attch.) TAB-000124/02 Jan.2024 TAB PROJECT…

(Hochster Pharma) works in (Liquid, micro, Solid, Dispensing area)

Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Protocol RQP-H-13823 1/10/2024 Production area 02 HVAC Operation Re-Qualification Protocol RQP-H-00124 1/10/2024 Solid area 03 HVAC Operation Re-Qualification Protocol RQP-H-00324 1/10/2024 Dispensing area 04 HVAC Operation Re-Qualification Protocol RQP-H-00224 1/10/2024 Micro Area…