Sr. Doc. Name Doc. No. Issue Date Project System 1 HVAC Installation Qualification Report IQP-H-02223 Nov.,2023 Hazard Material Room 2 Testing, Adjusting & Balancing Report TAB10123 Nov.,2023 Hazard Material Room 3 HVAC Operation Qualification Report OQP-H-11423 Feb.,2024 Hazard Material Room…
(PHILO) works in (HVAC operation re Qualification)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Protocol RQP-H-01824 26/2/2024 HVAC 02 HVAC Operation Re-Qualification Annex RQP-H-01824 26/2/2024 HVAC 03 Installed heap filter leak test report HLT-02624 26/2/2024 HVAC 04 Installed heap filter leak test report HLT-02724 26/2/2024 HVAC…
(HIKMA October) Works in ( AHU-076 )
Sr. Doc. Name Doc No. Issue date Project System 01 Recovery Rate Test Reports RRT-00723 Feb.,2024 AHU-076…
(Art Pharma) works in (Production Area)
Sr. Doc. Name Doc No. Issue date Project System 01 Compressed Nitrogen System Operation Qualification Report OQP- G -00924 25/2/2024 Production Area…
(MEVAC) works in (Sampling, Oil Tank & Live Vaccine Filling Area)
Sr. Doc. Name Doc No. Issue date Project System 01 Air Visualization Test Report AVN-00824 25/2/2024 Sampling Area 02 Air Visualization Test Report AVU-00424 25/2/2024 Live Vaccine Filling Area 03 Air Visualization Test Report AVU-00524 25/2/2024 Sampling Area 04 Air Visualization Test Report AVU-00624 25/2/2024 Sampling Area 05 Air Visualization Test Report AVU-00724 25/2/2024 Live Vaccine Filling Area 06 Air Visualization Test Report AVN-00924 25/2/2024 Sampling Area 07 Air Visualization Test Report AVN-01024 25/2/2024 Oil Tank Area 08 Air…
CIRA PHARMA
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Qualification Protocol OQP-H-01623 Feb.,2024 Cream Filling, Cream Preparation & LABs Areas 2 Compressed Gas System Operation Qualification Protocol OQP-G-01324 Feb.,2024 Cream Filling, Cream Preparation & LABs Areas 3 HVAC Installation Qualification Protocol IQP-H-02423 Nov.,2023 Cream Filling, Cream Preparation & LABs Areas …
RIYADH PHARMA-AUTOCLAVE-THV-KSA
Sr. Doc. Name Doc. No Issue date Project System 1 TEMPERATURE VALIDATION PROTOCOL THV-00124 DEC.2023 AUTOCLAVE…
(SEDICO) works in (Package Area)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report TAB-01024 14/2/2024 Package Area 02 Operation Qualification Protocol &Annex OQP-L-01024 14/2/2024 Package Area…
IEC
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report TAB- 00124 13/2/2024 Ground Floor…
(Biogeneric Pharma) Works in LAFs Operation Qualification Report in (Filling Area)
Sr. Doc. Name Doc No. Issue date Project System 1 LAFs Operation Qualification Protocol & Annexes OQP-L-02824 Feb .,2024 Filling Area…