Sr. Doc. Name Doc. No Issue date Project System 01 Raw Primary Material Warehouse (Report) THM-00422 Sep., 2022 Thermal Mapping…
Gypto pharma
Sr. Doc. Name Doc No. Issue date Project System 01 DUCT TRAVERSE TEST REPORT DTR-00122 Dec.,2022 AHU-2/1 02 DUCT TRAVERSE TEST REPORT DTR-00222 Dec.,2022 AHU-2/2…
Johnson
Sr. Doc. Name Doc No. Issue date Project System 01 Weighing Booth Operation RE-Qualification Report RQP-L-10922 Dec., 2022 Weighing Booth(WB-3500)…
Otsuka ATECO
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation RE-Qualification RQP-H-08922 Nov.,2022 AHUs-01,02,06…
Otsuka Ateco
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Performance Qualification Report PQP-G-01222 Dec., 2022 PQ…
PPI Factory-KSA -Initial Survey for HVAC
Sr. Doc. Name Issue date Project System 01 Initial survey technical report HVAC system DEC., 2022 HVAC system…
Total Air-Ejust
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report TAB-11022 Dec, 2022 TAB…
Marcyrl -Non Sterile
S.N Doc. Name Doc No. Issue date Project System 1 Units Operation Re-Qualification RQP-L-(10622-10822) Aug.2022 1 LAF, 2 Isolators 2 HVAC Operation Re-Qualification(Non sterile Area) RQP-H-06922 Aug.2022 AHU-07,AHU-08,AHU-09,AHU-10,AHU-11…
Kimal
Sr. Doc. Name Doc No. Issue date Project System 01 As-Found Measurements Report TAB-10822 Dec, 2022 AHUs-001,002,003 & PCU-003…
Apex Pharma (KSA)-Thermal Mapping
Sr. Doc. Name Doc. No Issue date Project System 01 Cold & Dry Store 1 (GF-62) (Report) THM-00622 Aug., 2022 Thermal Mapping 02 Cold & Dry Store 1 (GF-94 A) (Report) THM-00922 Aug., 2022 Thermal Mapping 03 Cold Store 2 (GF-94) (Report) THM-00722 Aug., 2022 Thermal Mapping…