S.N Doc. Name Doc No. Issue date Project System 1 LAF HVAC Re-Qualification Protocol &Annexes RQP-L-04222 Apr.2022 SEDICO Sterile Area LAFs 2 LAF HVAC Re-Qualification Protocol &Annexes RQP-L-04322 Apr.2022 SEDICO Dispensing Area LAFs 3 LAF HVAC Re-Qualification Protocol &Annexes RQP-L-05322 Apr.2022 SEDICO Insulin Area LAFs 4 LAF HVAC Re-Qualification Protocol &Annexes RQP-L-05422 Apr.2022 SEDICO Sterile Plastic Ampoule Area LAFs…
Vaccine valley -AHU3A-3B
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Protocol RQP-H-09221 Dec.,2021 AHU(3A-3B)…
Impeller in Primary Health Care Clinic Slaiel Al Jahraa
Sr. Doc. Name Doc. No Issue date Project System 01 Testing, Adjusting & Balancing Report TAB-04822 May 2022 PU-01,02,03,04,05,06,07…
ELRAZY LAFs & Compressed
S.N Doc. Name Doc No. Issue date Project System 1 Compressed Gas Re-Qualification Protocol &Annex OQP-G-00922 Feb.2022 Production Area 2 LAF Operation Re- Qualification Protocol & Annex RQP-L-04622 Feb.2022 Microlab LAF 3 PB Operation Re- Qualification Protocol & Annex RQP-L-04722 Feb.2022 Passbox 4 LAF Operation Re- Qualification Protocol & Annex RQP-L-04822 Feb.2022 Sampling LAF 5 LAF Operation Re- Qualification Protocol & Annex RQP-L-04922 Feb.2022 Sterile LAF 6 WB Operation Re- Qualification Protocol & Annex RQP-L-05022 Feb.2022 Weighing Booth…
IMC-IEC
S.N Doc. Name Doc No. Issue date Project System 1 Testing, Adjusting & Balancing Report TAB- 04022 June., 2021 IEC Cyclotron Area 2 AIR CHANGE VERIFICATION TEST REPORTs ACH-05322 & ACH-05322 Mar.2022 IEC Cyclotron Area 3 ROOM PRESSURE VERIFICATION TEST REPORT PDT-00322 Mar.2022 IEC Cyclotron Area…
CIB (Elkuwait)
Sr. Doc. Name Doc. No Issue date Project System 01 Testing, Adjusting & Balancing Report Volume 01 of 03 TAB-04522 Nov 2019 Theater Building 02 Testing, Adjusting & Balancing Report Volume 02 of 03 TAB-04622 Nov 2019 Prison Building 03 Testing, Adjusting & Balancing Report Volume 03 of 03 TAB-04722 Nov 2019 Auxiliary Building…
LIPTIS
Sr. Doc. Name Doc No. Issue date Project System 01 FAN PERFORMANCE TEST REPORT FPT-00422 MaY.2022 EXHAUST16…
GYPTO PHARMA (ZONE-Corridor)
S.N Doc. Name Doc No. Issue date Project System 1 HVAC Design Qualification Protocol & Annex DQP-H-00622 Mar.2022 GYPTO PHARMA (ZONE-Corridor) 2 HVAC Installation Qualification Protocol & Annex IQP-H-01022 Mar.2022 GYPTO PHARMA (ZONE-Corridor) 3 HVAC Operation Qualification Protocol & Annex OQP-H-04122 Mar.2022 GYPTO PHARMA (ZONE-Corridor) 4 HVAC Testing Adjusting & Balancing Protocol & Annex TAB-04222 Mar.2022 GYPTO PHARMA (ZONE-Corridor) 5 HVAC Turn over package TOP-00622 Mar.2022 GYPTO PHARMA (ZONE-Corridor)…
SAUDI GELATIN AND CAPSULE CO.- Thermal mapping (Refrigerator)
Sr. Doc. Name Issue date Project System 01 Thermal mapping Protocol (Refrigerator) Dec.2021 Micro lab…
SAUDI GELATIN AND CAPSULE CO.- Thermal mapping (Incubator)
Sr. Doc. Name Issue date Project System 01 Thermal mapping Protocol (Incubator) Dec.2021 Micro lab…