Sr. Doc. Name Doc No. Issue date Project System 1 Compressed Gas System Operation Qualification Report RQP- G -00323 Feb.,2023 Compressed…
SEDICO SEMISOLID
S.N Doc. Name Doc No. Issue date Project System 1 WATER FLOW RATE MEASUREMENTS REPORT WBR-00323 Feb.2023 SEMISOLID AREA 2 HVAC Installation Qualification Protocol & Annex IQP-H-00323 Feb.2023 SEMISOLID AREA 3 HVAC Operation Qualification Protocol & Annex OQP-H-01123 Feb.2023 SEMISOLID AREA 4 HVAC Testing Adjusting & Balancing Protocol & Annex TAB-01223 Feb.2023 SEMISOLID AREA…
Egypt Theater
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing, Adjusting & Balancing Report TAB- 01523 Feb.,2023 AHUs (04A , 04B & 05)…
Egypt Pharma
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Qualification Protocol OQP-H-04022 April.2022 AHU-01,01’,02,03,04,05,06,07,08,09,09’,10,11 & 11’…
Al-Andalus LAF Operation Re-qualification
S.N Doc. Name Doc No. Issue date Project System 1 LAFs Operation Re-Qualification RQP-L-(01323- -01823) Feb.2023 LAFs…
GEMC
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing , Adjusting & Balancing Report TAB-01823 Feb.,2023 AHU-01…
Pioneer Factory Test Report
Sr. Doc. Name Doc. No Issue date Project System 01 Air Compressed Test Reports CAQ-00123 Feb.2023 Compressed Air…
Kordy
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing , Adjusting & Balancing Report TAB-01723 Feb.,2023 TAB…
Pioneer Factory TAG-BST Air Comp. Protocol
Sr. Doc. Name Doc. No Issue date Project System 01 Air Compressed Protocol & annex OQP-00123/1 Feb.2023 Compressed Air…
Art Pharma
Sr. Doc. Name Doc No. Issue date Project System 1 Compressed Nitrogen Quality Test CAQ-00123 Feb.2023 GB0-034/ Filling Room/ B 2 PB Operation Re-Qualification Protocol& Annex CAQ-00223 Feb.2023 GB0-019/ Preparation Room/ C…