Sr. Doc. Name Doc No. Issue date Project System 01 Operation Re-Qualification Tests Data Sheets RQP-H-04024 03/2024 AHU-6A,AHU-4B 02 HVAC Testing, Adjusting & Balancing Report TAB-02224 03/2024 AHU-6A,AHU-4B…
(COPAD Pharma) -Micro, Dispensing, Production & Sampling
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Qualification Protocol OQP-H-02424 25/3/2024 Micro 02 HVAC Operation Qualification Protocol OQP-H-02324 25/3/2024 Sampling Area 03 HVAC Operation Qualification Protocol OQP-H-02224 25/3/2024 Production Area 04 LAF Operation Re-Qualification Protocol RQP-L-06024 25/3/2024 Micro 05 PASS BOX Operation Re-Qualification Protocol RQP-L-05924 25/3/2024 Dispensing Area 06 LAF Operation Re-Qualification Protocol RQP-L-05824 25/3/2024 Sampling Area…
ADCO Pharma-Rivo area
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Installation Qualification Report IQP-H-00724 3/2024 AHU-(01,02,03,04&05) 02 HVAC Operation Qualification Report OQP-H-03824 3/2024 AHU-(01,02,03,04&05) 03 HVAC Testing, Adjusting & Balancing Report TAB-02024 3/2024 AHU-(01,02,03,04&05)…
ADCO Pharma-Semi-solid area
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Installation Qualification Report IQP-H-00524 3/2024 AHU-(01,02&03) 02 HVAC Operation Qualification Report RQP-H-03524 3/2024 AHU-(01,02&03) 03 HVAC Testing, Adjusting & Balancing Report TAB-01724 3/2024 AHU-(01,02&03)…
MARCYRL PHARMA
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Report RQP-H-03324 20/3/2024 Micro 02 HVAC Operation Re-Qualification Report RQP-H-03424 20/3/2024 Warehouse…
MUP
Sr. Doc. Name Doc. No. Issue date 1 Compressed Gas System Installation Qualification Protocol. IQP-C-00124 Jan., 2024 2 COMPRESSED AIR SYSTEM Operation Qualification Protocol. OQP-C-00224 Jan., 2024 3 Compressed Gas System Performance Qualification Protocol PQP- G -00124 Jan., 2024…
RIVA Pharma
Sr. Doc. Name Doc No. Issue date Project System 01 LAF Operation Re-Qualification Report RQP-L-00624 19/3/2024 Micro 02 LAF Operation Re-Qualification Report RQP-L-00724 19/3/2024 Safety Cabinet 03 LAF Operation Re-Qualification Report RQP-L-00824 19/3/2024 Sampling…
New Cooler
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report TAB-01524 17/3/2024 FCU…
Nile Pharma-Hormone Area
Sr. Doc. Name Doc. No. Issue date Project System 1 Installed HEPA filter leak test report. HLT-03424 Mar.,2024 AHU-01…
Nariman Hotel-4 Star
Sr. Doc. Name Doc No. Issue date Project System 01 PUMP PERFORMANCE TEST REPORT WPT-00124: WPT-00724 14/03/2024 Primary Pump-01,02,03,04 secondary pump-01,02,03 02 WATER FLOW RATE MEASUREMENT TEST REPORT WPR-00224: WPR-00324 14/03/2024 primary pumps secondary pumps…