ELECTRICAL SWITCHING STATION REPORT…
ARCR-TAG Design Review
GH & SCANNER BUILDING REPORT…
ARCR-Design Review – KSA
Earth Covered Magazine Building…
TAISIER-MED_(AHU-01)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Report RQP-H-04824 May.,2024 Production Area…
Jamjoom Pharma_ (Sterile Area)
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Report for AHUs RQP-H-04224 Apr.,2024 Sterile Area 2 HVAC Operation Re-Qualification Report for PassBoxes RQP-L-08424 Apr.,2024 Sterile Area 3 HVAC Operation Re-Qualification Report for LAFs RQP-L-08324 Apr.,2024 Sterile Area 4 Compressed Gas System Operation Qualification Report RQP-G-02424 Apr.,2024 Sterile Area…
SEMECO_ (New Capital City Monorail)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report TAB-03624 05/2024 B03-DX-P-01:03 B03-EX-F-RF-01:04 B03-PU-F-RF-01…
AUG PHARMA _ (Micro Lab Area)
Sr. Doc. Name Doc. No. Issue date Project System 1 HVAC Operation Re-Qualification Report OQP-H-05124 May,2024 AHU-17…
Movenpick resort
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Testing, Adjusting & Balancing Report TAB- 00924 Feb., 2024 From 1st To 5th Floor…
Archirodon Design Rev.
Shop DWGs Approving Letter…
(Kato) _ (Production Area)
Sr. Doc. Name Doc. No. Issue date Project System 1 LAF Operation Qualification Report OQP-L-08824 May,2024 LAF / MI-07…