Sr. Doc. Name Doc No. Issue date Project System 1 FCUs AIR FLOW RATE TEST REPORT ACH-05023 July,2023 Restaurant 2 EXF AIR FLOW RATE TEST REPORT ACH-05123 July,2023 Restaurant 3 FAHU AIR FLOW RATE TEST REPORT ACH-05223 July,2023 Restaurant 4 AHU PERFORMANCE MEASUREMENTS REPORT APT-02123 July,2023 Restaurant 5 FAN PERFORMANCE TEST REPORT FPT-00723 July,2023 Restaurant…
NUPCO PQ Package
Pre-Qualification Package…
(Units) Works in (SEDICO Oncology)
Sr. Doc. Name Doc No. Issue date Project System 01 LAFS Operation Re-Qualification Protocol & Annex RQP-L-06823 June,2023 Oncology Area 02 PASS Boxes Operation Re-Qualification Protocol & Annex RQP-L-06923 June,2023 Oncology Area 03 TUNNEL Operation Re-Qualification Protocol & Annex RQP-L-07023 June,2023 Oncology Area 04 ISOLATOR Operation Re-Qualification Protocol & Annex RQP-L-07123 June,2023 Oncology Area…
EGYPHAR1 RQ
Sr. Doc. Name Doc No. Issue date Project System 1 LAFS Operation Re-Qualification Protocol & Annex RQP-L-04123 Apr,2023 EGYPHAR 1 2 PASS Boxes Operation Re-Qualification Protocol & Annex RQP-L-04223 Apr,2023 EGYPHAR 1 3 HVAC Operation Re-Qualification Protocol & Annex RQP-H-05923 Apr,2023 Micro Area…
Jamjoom
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex RQP-H-06923 May.,2023 Sterile 2 LAFs Operation Re- Qualification Protocol RQP-L-05523 May.,2023 Sterile 3 Pass Boxes Operation Re-Qualification Protocol RQP-L-05523 May.,2023 Sterile 4 Compressed Gas System Performance Re-Qualification Report RQP-G-01023 May.,2023 Sterile 5 LUX MEASUREMENTS VERIFICATION TEST REPORT LMR-01523 May.,2023 Sterile…
Sedico
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex RQP-H-07823 May.,2023 Soft gelatine 2 HVAC Testing, Adjusting & Balancing Protocol& Annex TAB-06323 May.,2023 Soft gelatine…
Jedco
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex OQP-H-08123 June.,2023 AHUs (F03) Micro Area 2 INSTALLED HEPA FILTER LEAK TEST REPORT OQP-H-08223 June.,2023 AHUs (F01) QC Area 3 Compressed Air System Re-Qualification Protocol RQP-G-01923 June.,2023 compressed…
al andalous
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Operation Re-Qualification Protocol& Annex RQP-H-06223 May. ,2023 AHUs (14&21) Solid Area 2 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-06923 May. ,2023 AHUs (2) Semi Solid Area 3 INSTALLED HEPA FILTER LEAK TEST REPORT HLT-07023 May. ,2023 AHUs (10) Semi Solid Area…
Kahira pharmaceutical
Sr. Doc. Name Doc No. Issue date Project System 1 Installation Qualification Protocol & Annexes IQP-H-01323 June, 2023 Whole factory 2 Testing, Adjusting & Balancing Protocol & Annex TAB-06423 June, 2023 Chilled & Hot Water System 3 Performnace Qualification Protocol & Annexes PQP-H-00523 July,2023 Whole factory 4 AHU Operation Qualification Protocol & Annexes OQP-08323 July,2023 Whole factory …
(Weighing Booth) Works in (UNILEVER)
Sr. Doc. Name Doc No. Issue date Project System 01 Weighing Booth Operation Qualification Protocol & Annex RQP-L-09023 July,2023 Down Flow Booth…