Sr. Doc. Name Doc. No Issue date Project System 01 Autoclave (Report) THV-00223 Jun., 2023 Validation Report (Temp. Mapping)…
(DOP Test Reports) Works in (EVA PHARMA)
Sr. Doc. Name Doc No. Doc No. Issue date 1 Installed Hepa Filter Leak Test Reports From: HLT-07823 To: HLT-09423 July,2023…
Achievements Scope for medical industries Re-Qualification
Sr. Doc. Name Doc. No Issue date Project System 01 Re-Qualification (Protocol/Annex) for Bio-Safety Cabinet RQP-H–H00723/00 RQP-H–H00723/01 Jun., 2023 Requalification Protocol 02 Re-Qualification (Protocol/Annex) for Bio-Dispensing LAF RQP-H–H00823/00 RQP-H–H00823/01 Jun., 2023 Requalification Protocol 03 Re-Qualification (Protocol/Annex) for Bio- Micro LAF RQP-H–H00923/00 RQP-H–H00923/01 Jun., 2023 Requalification Protocol…
(AMC) Works in (KINGS INTERNATIONAL SCHOOL THE CROWN)
Sr. Doc. Name Doc No. Issue date Project System 1 AHU Performance Measurements Test Report (PU-ELS-01) APT-02223 July,2023 KINGS INTERNATIONAL SCHOOL THE CROWN 2 FAHU Performance Measurements Test Report (FAHU-ELS-01) APT-02323 July,2023 KINGS INTERNATIONAL SCHOOL THE CROWN 3 FAN Performance Test Report (EF-ELS-01, EF-ELS-02& EF-ELS-03) FPT-00823 July,2023 KINGS INTERNATIONAL SCHOOL THE CROWN 4 Air Flow Rate Test Report (PU-ELS-01)) PU-ELS-01 July,2023 KINGS INTERNATIONAL SCHOOL THE CROWN 5 Air Flow Rate Test Report (FCUs- IU-01, IU-03, IU-05& IU-08) ACH-05423 July,2023 KINGS…
KAUST C.G Protocol/Annex-KSA
Sr. Doc. Name Doc. No Issue date Project System 01 Qualification (Protocol/Annex) for Compressed Gas OQP-G–H00123/01 Jul., 2023 OQ-Protocol…
SEDICO -Operation Re-Qualification & Units
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re-Qualification Protocol & Annex RQP-H-08323 July,2023 Solid Area 02 Coating Machine DOP Test Report HLT-07723 July,2023 Solid Area 03 Pass-Boxes Operation Re-Qualification Report RQP-L-10023 July,2023 Solid Area 04 Weighing Booth Operation Re-Qualification Report RQP-L-09923 July,2023 Solid Area 05 LAFS Operation Re-Qualification Protocol & Annex RQP-L-06823 June,2023 Oncology Area 06 PASS Boxes Operation Re-Qualification Protocol & Annex RQP-L-06923 June,2023 Oncology Area 07 TUNNEL Operation Re-Qualification Protocol & Annex RQP-L-07023…
(Lafs) Works in (Nerhadou)
Sr. Doc. Name Doc No. Issue date Project System 01 LAFs Operation Re-Qualification Report Protocol & Annex OQP-L-10123 July,2023 Micro area…
(Art Pharma) Qualification
Sr. Doc. Name Doc No. Issue date Project System 01 Compressed Gas System Qualification Report OQP-G-01523 July,2023 Production area 02 TUNNEL Operation Re-Qualification Report RQP-L-08123 July,2023 Production area 03 HVAC Operation Qualification Report OQP-H-08023 July,2023 Production area 04 LAFs Operation Re-Qualification Reports RQP-L-08223 July,2023 Production area 05 Pass-Boxes Operation Re-Qualification Reports RQP-L-08323 July,2023 Production area…
(ME VAC) Works in (BSL3)
Sr. Doc. Name Doc No. Issue date Project System 1. HVAC Testing, Adjusting & Balancing Protocol TAB-05223 April, 2023 BSL3 (AHUs 1,2,3,4&5) 2. HVAC Operation Qualification Protocol OQP-H03423 May, 2023 BSL3 (AHUs 1,2,3,4&5) 3. INSTALLED HEPA FILTER LEAK TEST REPORT HLT-07623 May, 2023 Isolator BIBO 4. WATER PERFORMANCE TEST REPORT WBR-00523 April, 2023 Water System…
Hikma
Sr. Doc. Name Doc No. Issue date Project System 1 AIR VISUALIZATION TEST REPORT AVU-01723 June, 2023 Filling LAF FZ (EQ-PR-S-FI-03) Cooling LAF (EQ-PR-S-CO-14) Washing LAF (EQ-PR-S-CP-09) Laundry LAF (EQ-PR-S-CP-13) Crimping LAF (EQ-PR-S-CR-12) Filling LAF (EQ-PR-S-FI-11) Preparation LAF (EQ-PR-S-Mfg-10) Mobile LAF (EQ-PR-S-FI-16) UV Pass Box (EQ-PR-S-Mfg-28) CBW LAF (EQ-PR-S-CBW-15)…