Sr. Doc. Name Doc No. Issue date Project System 1 LAF Operation Qualification Protocol RQP-L-10624 May, 2024 Oncology Area 2 Isolator Operation Qualification Protocol RQP-L-10724 May, 2024 Oncology Area…
(Alandalous Pharma)_ (Micro Area, sampling area, solid area)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re Qualification Protocol RQP-H-07124 05/2024 AHU-07& AHU-08 02 HVAC Operation Re Qualification Protocol RQP-H-07224 05/2024 AHU-09 03 HVAC Operation Re Qualification Protocol RQP-H-07324 05/2024 AHU-14& AHU-21 04 Pass Box Operation Re Qualification Protocol RQP-L-10024 05/2024 QC096 05 Pass Box Operation Re Qualification Protocol RQP-L-10024 05/2024 QC071…
((Ministry of Environment) _ (L1 Building Basement 1 & 2)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC TESTING, ADJUSTING & BALANCING TEST REPORT APT-01324 May,2024 EX-04 02 HVAC TESTING, ADJUSTING & BALANCING TEST REPORT APT-01424 May,2024 L1-RF-EF-07 03 HVAC TESTING, ADJUSTING & BALANCING TEST REPORT APT-01524 May,2024 L1-RF-EF-12…
(SIGMA)_ (Liquid Area)
Sr. Doc. Name Doc.No Issue date Project system 1 HVAC Testing, Adjusting & Balancing Protocol TAB-04324 May,2024 AHU-38 AHU-14 2 HVAC Operation Re-Qualification Protocol RQP-H-07624 May,2024 AHU-38 AHU-14…
SEDICO-SEMISOLID OQ
Requalification Protocol for semisolid Area (1Protocol & 1Annex)…
(Alandalous Pharma) _ (Micro Area, sampling area, solid area)
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation Re Qualification Protocol RQP-H-07124 05/2024 AHU-07& AHU-08 02 HVAC Operation Re Qualification Protocol RQP-H-07224 05/2024 AHU-09 03 HVAC Operation Re Qualification Protocol RQP-H-07324 05/2024 AHU-14& AHU-21 04 Pass Box Operation Re Qualification Protocol RQP-L-10024 05/2024 QC096 05 Pass Box Operation Re Qualification Protocol RQP-L-10024 05/2024 QC071…
RIYADH PHARMA-KSA
THERMAL VALIDATION – SIP FILLING LINE…
(MISR PHARMACETICULES) _ (Sampling & Dispensing Area)
Sr. Doc. Name Doc. No. Issue date Project System 1 HVAC Installation Qualification Report IQP-H-01624 May,2024 AHU-01& AHU-02 2 HVAC Testing, Adjusting & Balancing Report TAB-04124 May,2024 AHU-01& AHU-02 3 HVAC Operation Qualification Report OQP-H-06524 May,2024 AHU-01& AHU-02 4 TURN OVER PACKAGE TOP-01024 May,2024 AHU-01& AHU-02…
(CID Haram) _ (Tablet Area /منطقة الأقراص الفوارة)
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Installation Qualification Reports for AHUs IQP-H-01724 May, 2024 Tablet Area /منطقة الأقراص الفوارة 2 HVAC Testing, Adjusting & Balancing Reports for AHUs TAB-04224 May, 2024 Tablet Area /منطقة الأقراص الفوارة 3 HVAC Operation Qualification Reports for AHUs OQP-H-06624 May, 2024 Tablet Area /منطقة الأقراص الفوارة 4 Turn Over Package TOP-01024 May, 2024 Tablet Area /منطقة الأقراص الفوارة…
CID-HARAM-IQ FOR TABLET AREA
Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Installation Qualification Reports for AHUs IQP-H-01724 May, 2024 Tablet Area /منطقة الأقراص الفوارة 2 HVAC Testing, Adjusting & Balancing Reports for AHUs TAB-04224 May, 2024 Tablet Area /منطقة الأقراص الفوارة 3 HVAC Operation Qualification Reports for AHUs OQP-H-06624 May, 2024 Tablet Area /منطقة الأقراص الفوارة 4 Turn Over Package TOP-01024 May, 2024 Tablet Area /منطقة الأقراص الفوارة…