Sr. Doc. Name Doc. No Issue date Project System 01 Retained Finish Room (GF-194) (Report) THM-01722 Sep., 2022 Thermal Mapping 02 Retained Finish Room (GF-195) (Report) THM-01822 Sep., 2022 Thermal Mapping…
Egyphar-Micro lab
Sr. Doc. Name Doc No. Issue date Project System 1 Volume 01 of 03 Installation Qualification Protocol IQP-H-02322 Oct.,2022 Micro Lab 2 Volume 02 of 03 Testing, Adjusting & Balancing Protocol TAB-10922 Oct.,2022 Micro Lab 3 Volume 03 of 03 Operation Qualification Protocol OQP-H-09722 Oct.,2022 Micro Lab 4 Turn Over Package TOP-01222 Oct.,2022 Micro Lab…
Liptis-Compressed
Sr. Doc. Name Doc No. Issue date Project System Compressed Air System Operation Re-Qualification Protocol RQP-G-02722 Dec.,2022 Processing & Utilities Areas…
Sanofi
S.N Doc. Name Doc No. Issue date Project System 1 HVAC Testing, Adjusting & Balancing Report (Before & After ACH reduction) TAB-11022 Nov.2022 AHU02 2 HVAC Testing, Adjusting & Balancing Report (Before & After ACH reduction) TAB-11122 Dec.2022 AHU03 3 HVAC Testing, Adjusting & Balancing Report (Before & After ACH reduction) TAB-11222 Dec.2022 AHU ZMSE…
Raw Primary Material Warehouse Report
Sr. Doc. Name Doc. No Issue date Project System 01 Raw Primary Material Warehouse (Report) THM-00422 Sep., 2022 Thermal Mapping…
Gypto pharma
Sr. Doc. Name Doc No. Issue date Project System 01 DUCT TRAVERSE TEST REPORT DTR-00122 Dec.,2022 AHU-2/1 02 DUCT TRAVERSE TEST REPORT DTR-00222 Dec.,2022 AHU-2/2…
Johnson
Sr. Doc. Name Doc No. Issue date Project System 01 Weighing Booth Operation RE-Qualification Report RQP-L-10922 Dec., 2022 Weighing Booth(WB-3500)…
Otsuka ATECO
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Operation RE-Qualification RQP-H-08922 Nov.,2022 AHUs-01,02,06…
Otsuka Ateco
Sr. Doc. Name Doc No. Issue date Project System 01 HVAC Performance Qualification Report PQP-G-01222 Dec., 2022 PQ…
PPI Factory-KSA -Initial Survey for HVAC
Sr. Doc. Name Issue date Project System 01 Initial survey technical report HVAC system DEC., 2022 HVAC system…