Author: Ramy Zyada

(SEDICO) Works in (ONCOLOGY RQ)

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing, Adjusting & Balancing Protocol& Annexes TAB-09923 Oct, 2023 ONCOLOGY 2 HVAC Operation Re-Qualification Protocol& Annexes RQP-H-11323 Oct., 2023 ONCOLOGY 3 LAFs Operation Re-Qualification Report Protocol& Annexes RQP-L-16523 Oct., 2023 ONCOLOGY 4 Pass Boxes Operation Re-Qualification Report Protocol& Annexes RQP-L-16623 Oct., 2023 ONCOLOGY 5 Tunnel Operation Re-Qualification Report Protocol& Annexe RQP-L-17923 Oct., 2023 ONCOLOGY 6 Isolator Operation Re-Qualification Report Protocol& Annexe RQP-L-18023 Oct., 2023 ONCOLOGY…

(UTOPIA ) Works in (Units )

Sr. Doc. Name Doc No. Issue date Project System   LAF & Safety Cabinet Operation Re-Qualification Report RQP-L-14523 Sep.,2023 Micro Area   FILTER AIR VELOCITY VERIFICATION TEST REPORT (MB-DPB-01) FVT-02123 Sep.,2023 Pass box / MB-DPB-01   FILTER AIR VELOCITY VERIFICATION TEST REPORT (MB-DPB-02) FVT-02223 Sep.,2023 Pass box / MB-DPB-02   FILTER AIR VELOCITY VERIFICATION TEST REPORT (MB-DPB-03) FVT-02323 Sep.,2023 Pass box / MB-DPB-03   FILTER AIR VELOCITY VERIFICATION TEST REPORT (MB-DPB-04) FVT-02423 Sep.,2023 Pass box / MB-DPB-04   FILTER AIR…

(Sedico) Works in (Sterile & insulin areas and LAFs)

Sr. Doc. Name Doc No. Issue date Project System   Operation Re-Qualification Protocol & Annexes for Insulin Area RQP-H-10223 Sep.,2023 Insulin Area   Operation Re-Qualification Protocol & Annexes for Sterile Area RQP-H-09623 Sep.,2023 Sterile Area   Operation Re-Qualification Protocol & Annexes for Pass box in insulin Area RQP-L-15823 Sep.,2023 Insulin Area   Operation Re-Qualification Protocol & Annexes for Tunnel in Insulin Area RQP-L-15923 Sep.,2023 Insulin Area   Operation Re-Qualification Protocol & Annexes for LAFs in Insulin Area RQP-L-15123 Sep.,2023  …

(MEVAC) Works in (B2 Area)

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing, Adjusting & Balancing Protocol& Annexes TAB-09823 Sep., 2023 B2 Area 2 HVAC Operation Qualification Protocol& Annexes OQP-H-10923 Oct., 2023 B2 Area 3 HVAC Testing, Adjusting & Balancing Protocol& Annexes TAB10023 Sep., 2023 First Floor 4 HVAC Operation Qualification Protocol& Annexes OQP-H-11323 Oct., 2023 First Floor 5 Turn Over Package TOP-01023 Oct., 2023 B2 Area 6 Air Visualization UDAF Test Reports From AVU-03323 tTo AVU-04123 Oct., 2023 B2 Area…

Sedico-units

Sr. Doc. Name Doc No. Issue date Project System 01 Safety Cabinet Operation Re-Qualification Protocol & Annex RQP-L-16023 Sep.,2023 Microbiology 02 INSTALLED HEPA FILTER LEAK TEST REPORT From : HLT-12623 To      : HLT-13723 Sep.,2023 Oncology Plant 03 AIR VELOCITY VERIFICATION TEST REPORT From : FHV-000423 To      : FHV-000623 Sep.,2023 Microbiology 04 AIR VISUALIZATION TEST REPORT (NUDAF) From : FHP-000423 To      : FHP-000623 Sep.,2023 Microbiology…

(DAR ) Works in Dar New Premises Building (Air Side & Chilled Water System)

Sr. Doc. Name Doc No. Issue date Project System 1.   HVAC Testing , Adjusting & Balancing Report (Air Side) TAB-09023 Oct.,2023 Dar New Premises Building 2.   HVAC Testing , Adjusting & Balancing Report (Chilled Water System ) TAB-09123 Oct.,2023 Dar New Premises Building 3.   Turn Over Package TOP-00923 Oct.,2023 Dar New Premises Building 4. Sequence Of Procedures – mar.,2024 Dar New Premises Building…

(MARCYRL) Works in (Units)

Sr. Doc. Name Doc No. Issue date Project System 1 Operation Re-Qualification Protocol & Annex RQP-L-13923 Aug., 2023 Units 1- Pass Box-5(Disinfectant) / S27_PB 2- Pass Box-6(Autoclave) / S29_PB 3- Pass Box-7(DE-Gowning) / S24_PB 4- Mobile LAF 1 / PR_33 5- Mobile LAF 2 / PR_34 6- Filling Machine LAF / PR_23 7- Compounding LAF / PR_31 8- Disinfectant LAF / PR_29 9- Garments washing LAF / PR_32 10- Tools Washing LAF / PR_30 2.   Operation Re-Qualification Protocol &…

(third party) Works in (kitchen Area)

Sr. Doc. Name Doc No. Issue date Project System 1 AIR FLOW RATE TEST REPORT ACH-05723 Sep., 2023 Kitchen Area 2 FAN PERFORMANCE & AIR FLOW RATE TEST REPORT FPT-01223 Sep., 2023 Kitchen Area 3 WATER FLOW RATE MEASUREMENTS REPORT WBR-01123 Sep., 2023 Kitchen Area…