Author: Ramy Zyada

JamJoom-Solid

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Lux Measurement Verification Test Report LMR-00624 June, 2024 Solid…

JamJoom-Semi-Solid

Sr. Doc. Name Doc No. Issue date Project System 1 Pass Box Operation Re-Qualification Report OQP-L-18124 July, 2024 Semi-Solid…

(BIOGENERIC) _ (ACCINE AREA)

Sr. Doc. Name Doc.No Issue date Project system 1 HVAC Design Qualification Protocol (Before ACH Reduction) DQP-H-00424 July,2024 VACCINE AREA 2 HVAC Design Qualification Protocol (After ACH Reduction) DQP-H-00524 July,2024 VACCINE AREA 3 HVAC Technical Assessment Report (Before ACH Reduction) – June.2024 VACCINE AREA 4 HVAC Technical Assessment Report (After ACH Reduction) – July,2024 VACCINE AREA 5 HVAC Installation Qualification Report IQP-H-02624 Apri,l2024 VACCINE AREA 6 HVAC As Found Measurements Report TAB-06024 Apri,l2024 VACCINE AREA 7 HVAC Testing, Adjusting &…

Riva Pharma Traverse Test Reports

Doc. Name Doc. No. Issue Date DUCT TRAVERSE TEST REPORT AHU-05 DRT-00224 Jul.,2024 DUCT TRAVERSE TEST REPORT AHU-05 DRT-00224 Jul.,2024 DUCT TRAVERSE TEST REPORT AHU-05 DRT-00224 Jul.,2024 DUCT TRAVERSE TEST REPORT AHU-05 DRT-00224 Jul.,2024…

CID Haram (Tablet Area / منطقة الأقراص الفوارة) / OQ & PQ

Sr. Doc. Name Doc. No. Issue date Project System 1 HVACOPERATION QUALIFICATION PROTOCOL OQP-H-09424 July, 2024 Teblet Area/ منطقة الأقراص الفوارة 2 HVACPERFORMANCE QUALIFICATION PROTOCOL PQP-G-01624 July, 2024 Teblet Area/ منطقة الأقراص الفوارة 3 HVACTesting, Adjusting & Balancing PROTOCOL for Water System TAB-07524 Sep., 2024 Whole Factory…

GSK-Micro -Area

Sr. Doc. Name Doc No. Issue date Project System 1 HVAC Testing, Adjusting & Balancing Reports ForAHUs-(01, 02 & 03) TAB-06124 July, 2024 Micro…